CN Boyer River Bridge #7


Click the photo to view the full-size version

1/12
Date Taken:
Author:
Caption:

Name CN Boyer River Bridge #7
Illinois Central Railroad Bridge #WA469.3
Built By Illinois Central Railroad
Currently Owned By Canadian National Railway
Superstructure Contractor American Bridge Works of Chicago, Illinois (Center Span)
Unknown (East and West Spans)
Substructure Contractor Unknown
Length 227 Feet Total, 91 Foot Main Span
Width 1 Track
Height Above Ground 15 Feet (Estimated)
Superstructure Design Through Plate Girder and Timber Pile Trestle
Substructure Design Concrete and Timber Pile
Date Fabricated 1899
Date Erected 1899 (Center Span)
1919 (South Span)
1946 (North Span)
Original Location Unknown (South Span)
Unknown (North Span)
Traffic Count 2 Trains/Day (Estimated)
Current Status In Use
Illinois Central Railroad Bridge Number WA469.3
Canadian National Railway Bridge Number 469.3
Significance Local Significance
Documentation Date 10/16/2015

Between 1857 and 1870, the Dubuque and Sioux City Railroad (D&SC) had acquired and constructed a mainline across central Iowa, extending from the Mississippi River at Dubuque, Iowa to the Missouri River at Sioux City, Iowa.  The D&SC had operated under lease from the Illinois Central Railroad (IC) since 1867, and connected to the IC system by using a bridge across the Mississippi River at Dubuque.  This line provided several opportunities for the construction of branch lines.  By the late 19th Century, the IC desired to enter the Council Bluffs, Iowa/Omaha, Nebraska markets.   In 1890, the Omaha Bridge & Terminal Railway (OB&T) began construction on a line extending between Council Bluffs, Iowa and Omaha, Nebraska.  A new bridge was constructed across the Missouri River between 1893 and 1894, with the goal of breaking the Union Pacific Railroad (UP) monopoly of traffic crossing the Missouri River at Omaha.  Between September 1898 and January 1900, the Fort Dodge and Omaha Railroad (FD&O) constructed a 131-mile railroad line, extending from the existing D&SC mainline at Tara, Iowa to Council Bluffs, Iowa.  The FD&O and OB&T were both leased by the D&SC/IC in 1899.

By the late 19th Century, the IC had developed and operated a sprawling railroad network in the central United States.  This line served as a secondary mainline for the company, connecting Chicago to the Missouri River at Omaha.  In the 20th Century, the IC had become a respected railroad, connecting several major cities in the central United States.  The D&SC was fully merged into the IC in 1946.  In 1972, the IC merged with the Gulf, Mobile & Ohio Railroad (GM&O) to form the Illinois Central Gulf (ICG).  The bridge across the Missouri River was placed out of service in approximately 1980, although the tracks remain today.  The entire IC system in Iowa, as well as the line between Dubuque and Chicago, were sold to the Chicago Central & Pacific Railroad (CC&P) in 1995.  In 1988, the ICG was reorganized as the Illinois Central Railroad (IC).  In 1996, the CC&P was repurchased by IC and in 1998, IC was purchased by the Canadian National Railway (CN).  Today, CN operates the Omaha Subdivision between Tara and Council Bluffs.


Located alongside US Route 30 and the former Chicago & North Western Railway bridge, this through plate girder bridge is the seventh bridge carrying a former Illinois Central Railroad mainline over the Boyer River. When the railroad originally was constructed, the first bridge at this location consisted of a 91-foot and two 45-foot through plate girder spans, set onto concrete substructures. The Boyer River had long experienced severe floods, and by the early 20th Century it was decided to channelize the river. Originally, the river was channelized in the 1920s and 1930s. Railroad records indicate the southern 45-foot span was installed in 1919, using a span fabricated in 1899 at an unknown location. By the 1940s, it was decided that several bridges across the river needed to be lengthened or shifted to allow for a wider channel. In 1946, the bridge was significantly reconstructed, replacing the northern 45-foot span with a 75-foot span, constructing concrete piers and installing timber pile trestle spans at each end of the bridge. This 75-foot span was also fabricated in 1899, and reused from an additional unknown location. It is believed that both the 45-foot and 75-foot spans were reused from somewhere along the Fort Dodge to Omaha mainline, which saw significant improvements during the 1910s and again in the 1940s.

Currently, the bridge consists of a 75-foot through plate girder span on the north end, a 91-foot span in the center and an 87-foot span on the south end. Only the center span is original to this bridge, while the approach spans were reused from other locations. The main spans are set onto concrete substructures, while the approaches are set onto timber pile substructures. The three main spans all use a similar design, with two girders, square girder ends and a standard floor system. Due to the different span lengths, the girders are all different heights. The piers use a standard IC design for the era, consisting of two concrete columns, connected by an arched concrete beam at the top. It is believed this style of pier was used to reduce material and improve channel flow. The approaches also use a standard IC design, consisting of ballast deck spans set onto bents. American Bridge Works fabricated the center span, while the outer spans were fabricated by an unknown contractor. Since American Bridge Works had the contract for all steel bridges on this line, it is likely that these spans were constructed by that firm. It is unclear if the concrete substructures were constructed by an unknown contractor or railroad company forces. The timber components of the bridge were constructed by railroad company forces. Through plate girder spans were popular for railroad use, as they were durable and easy to construct. Since the 1946 reconstruction, the bridge has seen no significant alterations, and remains in regular use. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being locally significant, due to the common design.


Citations

Build dates Illinois Central Gulf Railroad Iowa Division 1973 Track Profile
Builder (center span superstructure) The Railroad Gazette; Volume 31, Issue 13
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele

Loading...