Name | UP Water Street Bridge (Wilmington) Chicago & Alton Railroad Bridge #52.70 |
Built By | Chicago & Alton Railroad |
Currently Owned By | Union Pacific Railroad |
Superstructure Contractor | American Bridge Company of New York |
Substructure Contractor | Unknown |
Length | 34 Feet Total |
Width | 3 Tracks, 1 In Use (At Time Of Replacement) |
Height Above Ground | 12 Feet (Estimated) |
Superstructure Design | Deck Plate Girder |
Substructure Design | Stone Masonry and Concrete |
Date Built | 1916 |
Date Replaced | 2017 |
Traffic Count | 0 Trains/Day (Bridge has been Replaced) |
Current Status | Replaced by a new bridge |
Chicago & Alton Railroad Bridge Number | 52.70 |
Union Pacific Railroad Bridge Number | 52.70 |
Significance | Local Significance |
Documentation Date | 6/9/2015 |
In 1850, the Alton and Sangamon Railroad began construction on a 220 mile railroad line, extending from Joliet, Illinois to Alton, Illinois; with stations in Bloomington and Springfield, Illinois. The railroad was acquired by the Chicago, Alton & St. Louis Railroad and completed in 1855. The Alton and St. Louis Railroad constructed a 22 mile line from Alton to East St. Louis in 1856. The railroads were reorganized as the St. Louis, Alton & Chicago Railroad in 1857, and was merged into the Chicago & Alton Railroad (C&A) in 1862. The C&A developed several lines throughout central Illinois, and this route made up the principal mainline of the system. A bypass of Alton between Godfrey and East St. Louis was constructed in As traffic grew on the system through the 1870s and 1880s, the need for a second track became apparent. A second track was added in 1870 between Mazonia and Odell, from 1888 to 1893 between Odell and Bloomington, and through Springfield in 1893. This route became an important route to the Illinois railroad network, providing the most direct connection between St. Louis and Chicago.
Throughout the years, the C&A would be affiliated with several
larger railroads, and the railroad primarily operated as a bridge
route. The C&A was reorganized in 1901, and until 1906 was owned by
the Atchison, Topeka & Santa Fe Railway and the Chicago, Rock
Island & Pacific Railway. Between Bloomington and Springfield, a second track was constructed in 1907, and a second track was constructed in 1911 between Springfield and East St. Louis. A large realignment was made between Atlanta
and Lawndale in 1924. In 1931, the C&A would be reorganized as the Alton Railroad (A), a
subsidiary of the Baltimore & Ohio Railroad. The Alton was sold to
the Gulf, Mobile & Ohio Railroad (GM&O) in 1949, and the various
subsidiaries consolidated at that time. The GM&O merged with the
Illinois Central Railroad to form Illinois Central Gulf (ICG) in 1972.
During the ICG years, the route was downgraded, and the second track mostly removed. This line was excess for the ICG, and the route would be sold to the
Chicago, Missouri & Western Railway (CM&W) in 1987. The CM&W went bankrupt, and the line was sold to the Southern Pacific Railroad in 1989, which became part of Union Pacific Railroad in 1996. During the 2010s, the route was rebuilt for high speed rail. Today, Union Pacific continues to operate this route as the Joliet Subdivision between Joliet and Bloomington, and the Springfield Subdivision between Bloomington and East St. Louis. High speed Amtrak trains also utilize this route.
Located in Wilmington, this small deck plate girder bridge once carried the former Chicago & Alton Railroad over Water Street. The previous bridge at this location had been constructed in 1886, and consisted of a 34-foot deck plate girder span, constructed for three tracks and set onto stone abutments. This bridge was one of many lightweight girder spans constructed by the C&A during the mid-1880s. By the 1910s, this bridge had become too light for traffic, and would be replaced by a deck plate girder span, reusing the stone abutments. The bridge would consist of a 34-foot deck plate girder span, set onto stone abutments which were reinforced with concrete. The superstructure used a standard design, with shallow girders and heavy internal bracing. American Bridge Company fabricated the superstructure, while unknown contractors constructed the substructure. Deck plate girder spans were commonly used by railroads, as they were durable and easy to construct. In 2017, the bridge would be replaced by a new single track girder span as part of a high-speed rail project, and a second track was added to the new bridge in 2023. The new bridge reuses portions of the original stone abutments, which were reconstructed to accommodate the modern superstructure. Overall, the bridge was in fair condition at the time of replacement, but did not meet the needs of the proposed high-speed rail coordinator. The author has ranked the bridge as being locally significant, due to the common design.
Citations
Build date | Illinois Central Gulf Missouri Division 1979 Track Profile |
Builder | Missing American Bridge Company plaque |
Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |