| Name | CN Bear Creek Bridge (Shellsburg, West) Chicago, Rock Island & Pacific Railroad Bridge #1115 |
| Built By | Burlington, Cedar Rapids & Northern Railway |
| Currently Owned By | Canadian National Railway |
| Superstructure Contractor | American Bridge Company of New York (Span #4)
Lassig Bridge & Iron Works of Chicago, Illinois (Spans #5 and #6) Unknown (Spans #1-#3) |
| Substructure Contractor | Unknown |
| Length | 240 Feet Total, 40 Foot Spans |
| Width | 1 Track |
| Height Above Ground | 10 Feet (Estimated) |
| Superstructure Design | Deck Plate Girder |
| Substructure Design | Stone Masonry |
| Date Fabricated | 1897 (Spans #5 and #6) 1901 (Spans #1-#3) 1903 (Span #4) |
| Date Erected | 1902 (Spans #1-#3) c. 1960 (Spans #4-#6) |
| Original Locations | Unknown (Span #4) Unknown (Span #5) Unknown (Span #6) |
| Traffic Count | 4 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago, Rock Island & Pacific Railroad Bridge Number | 1115 |
| Significance | Local Significance |
| Documentation Date | 8/10/2013; 6/3/2018 |
In 1870, the Burlington, Cedar Rapids & Minnesota Railway (BCR&M) began construction on a new railroad line, constructing 41 miles from Burlington, Iowa north to Columbus Junction, Iowa. The following year, the railroad was completed an additional 116 miles through Cedar Rapids, Iowa to Waterloo, Iowa. In 1872, an additional 64 miles was completed to Plymouth, Iowa. Work on the line resumed in 1877, when the Burlington, Cedar Rapids & Northern Railway (BCR&N) completed an additional 5 miles to Manly, Iowa. In 1878, the BCR&M became part of the BCR&N, completing a diagonal mainline from far southeast Iowa to north central Iowa. By the 1880s, the BCR&N had become an important railroad in Iowa, connecting towns and cities in southeast Iowa to northern Iowa. This line formed the principal mainline of the company, allowing for the construction of many additional branch lines. By the turn of the 20th Century, the BCR&N operated over 1,000 miles of track throughout Iowa, connecting both small towns and large cities. This line also served the basis of a northern extension to St. Paul, Minnesota; which was constructed between 1900 and 1901. In June 1903, the BCR&N was acquired by the Chicago, Rock Island & Pacific Railway (Rock Island), which operated a large railroad network through the central United States. By acquiring the BCR&N, the Rock Island greatly expanded its service area, reaching major hubs such as St. Paul and Sioux Falls, South Dakota.
The Rock Island struggled financially throughout much of its history, experiencing repeated bankruptcies and chronic instability. After World War II, the Rock Island struggled to survive, proposing mergers and deferring maintenance on their routes. The railroad reorganized as the Chicago, Rock Island & Pacific Railroad in 1948. Despite the financial troubles, the Rock Island continued to use this route as a mainline, connecting to major agricultural areas in northern Iowa. By the mid-1970s, the railroad was in serious decline. The railroad secured loans to eliminate slow orders, acquired new equipment, and attempted to restore profitability. In 1978, the railroad came close to profit, but creditors were lobbying for a complete shutdown of the Rock Island. During the fall of 1979, a strike crippled the railroad, and by January of 1980, the entire system was ordered to be shut down and liquidated. Many of the lines and equipment were scrapped. Profitable sections of railroad were prepared for sale. In 1981, a group of grain elevators along the route formed a short line railroad to operate over the bankrupt line.
In 1981 and 1982, the railroad was rehabilitated for use, and the route reopened for service. In 1984, the Iowa Northern Railway (IANR) purchased the line. A derailment near Burlington in 1985 caused the abandonment of much of the line south of Cedar Rapids, with only a small segment at Columbus Junction being sold to the Soo Line, which was controlled by Canadian Pacific Railway (CP) that year. In the late 20th Century, the IANR became a profitable railroad, serving a variety of agricultural industries between Cedar Rapids and Manly. A short segment of the line in Waterloo was abandoned in 1988, as the IANR had acquired trackage rights on a different line. In 1994, IANR was sold to Iron Road Railways (IRR), a holding company. In 1997, CP would sell the line segment to I&M Rail Link, which was later purchased by the Dakota, Minnesota & Eastern Railroad (DM&E) subsidiary Iowa, Chicago & Eastern Railroad (IC&E). After the bankruptcy of the IRR in 2003, the IANR was purchased by a former director of IRR, and grew considerably into a significant regional railroad.
The DM&E/IC&E were purchased by Canadian Pacific in 2008, and the line at Columbus Junction abandoned shortly after due to a bridge collapse during the 2008 floods. In 2025, the IANR was purchased by Canadian National Railway (CN), which already operated a significant railroad network in northern Iowa. This was considered a somewhat unusual example of a large class-one railroad purchasing a short line with the intention of further growing business. At the time of purchase, the IANR not only owned the Cedar Rapids to Manly mainline, but also operated branch lines to Oelwein and Forest City. Today, CN operates the Cedar Rapids Subdivision between Cedar Rapids and Waterloo; and the Manly Subdivision between Waterloo and Manly. South of Cedar Rapids, portions of the line have become part of the Hoover Nature Trail, while other sections are outright abandoned.
Located alongside Canton Street in Shellsburg, this deck plate girder bridge carries a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over Bear Creek. The first bridge at this location was likely a timber pile trestle, constructed when the line was first built. It is unclear if the first bridge was ever replaced by a wooden truss bridge or a similar structure. Starting in the mid-1880s, the BCR&N invested significant capital into their system, replacing timber bridges with metal and stone structures. In 1902, the bridge was reconstructed with six deck plate girder spans, set onto stone substructures. In approximately 1960, the bridge was reconstructed by replacing the western three spans with secondhand deck plate girder spans, giving the bridge its present configuration. Currently, the bridge consists of six 40-foot deck plate girder spans, set onto stone substructures. Spans #1 through #3 (east spans) were originally fabricated in 1901, and are original to this bridge. Span #4 was fabricated in 1903 for use at an unknown location, and was later reused here. Spans #5 and #6 were both reportedly fabricated in 1897 for use at unknown location(s). It is unclear if these two spans were reused from the same location, or if they were reused from separate locations.
While all six spans are slightly different, all consist of two modest sized girders and an open deck. The eastern spans (spans #1 through #3) are all identical, and use three shorter panels between stiffeners on the outsides with two larger panels on the inside. Span #4 uses eight evenly spaced panels between stiffeners. Both spans #5 and #6 use eight panels between stiffeners, with two short panels at the ends and four larger panels at the center. All of the piers use a standard diamond shaped design, with an angled upstream nose. At some time in the mid-20th Century, the piers were capped with concrete. Both abutments use a standard design with short stepped wing walls. Stone for the bridge consists of tan-yellow cut limestone, likely quarried at Cedar Valley, Iowa. An unknown contractor fabricated spans #1 through #3, while American Bridge Company fabricated span #4 and the Lassig Bridge & Iron Works fabricated span #6. It is unclear if the substructure was constructed by an unknown contractor or railroad company forces. Deck plate girder spans were popular for railroad use, as they were durable and easy to construct. Railroads often reused steel and iron spans, as it provided a cost effective way to upgrade bridges without requiring large amounts of new material. Since the initial construction, the bridge has seen minor alterations, including the rebuilding of the top of pier #2 in the early 2020s and the addition of sheet pile and concrete reinforcement around the bases of several piers. Today, the bridge remains in use as part of a Canadian National Railway secondary line. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the common design and unclear history.
Citations
| Fabrication dates | Iowa Northern Railway TIGER Grant Application |
| Builder (span #4 superstructure) | American Bridge Company plaque |
| Builder (span #5 superstructure) | Missing Lassig Bridge & Iron Works plaque |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |