| Name | CN Cedar River Bridge (Cedar Falls) Illinois Central Railroad Bridge #W282.6 |
| Built By | Illinois Central Railroad |
| Currently Owned By | Canadian National Railway |
| Superstructure Contractor | American Bridge Works of Chicago, Illinois |
| Substructure Contractor | Unknown (1862 Construction) Unknown (1918 Repairs) Gould Construction Company of Davenport, Iowa (1949 Repairs) |
| Length | 445 Feet Total, 148 Foot Spans |
| Width | 1 Track |
| Height Above Ground | 20 Feet (Estimated) |
| Superstructure Design | Pratt Through Truss |
| Substructure Design | Stone Masonry and Concrete |
| Date Built | 1899; Strengthened 2025 |
| Traffic Count | 3 Trains/Day (Estimated) |
| Current Status | In Use |
| Illinois Central Railroad Bridge Number | W282.6 |
| Canadian National Railway Bridge Number | 282.6 |
| Significance | Regional Significance |
| Documentation Date | 8/9/2013; 9/23/2017 |
In 1857, the Dubuque and Pacific Railroad (D&P) began construction of a new mainline across central Iowa, which sought to link to the existing Illinois Central Railroad (IC) at Dubuque, Iowa. In May 1857, the first 29 miles were completed between Dubuque and Dyersville, Iowa. In March 1860, the line was completed an additional 49 miles from Dyersville to Jesup, Iowa. In 1860, the D&P was sold to the Dubuque and Sioux City Railroad (D&SC). The D&SC completed an additional 22 miles to Cedar Falls, Iowa in 1861; followed by an additional 43 miles to Iowa Falls, Iowa in 1866. By 1867, the IC had garnered interest in this line, and leased the D&SC. The following year, a bridge across the Mississippi River at Dubuque was completed to link this line and the IC line towards Freeport, Illinois. In August 1869, the Iowa Falls and Sioux City Railroad (IF&SC) completed an additional 49 miles from Iowa Falls to Fort Dodge, Iowa. In October 1870, an additional 135 miles were completed west to the Missouri River at Sioux City, Iowa. The IF&SC was also affiliated with the D&SC and IC; and was fully merged into the D&SC in 1888.
By the late 19th Century, the IC had developed and operated a sprawling railroad network in the central United States. This line served as a principal mainline for the company, connecting Chicago to the Missouri River at Sioux City. In the 20th Century, the IC had become a respected railroad, connecting several major cities in the central United States. The D&SC was fully merged into the IC in 1946. In 1972, the IC merged with the Gulf, Mobile & Ohio Railroad (GM&O) to form the Illinois Central Gulf (ICG). The entire IC system in Iowa, as well as the line between Dubuque and Chicago, were sold to the Chicago Central & Pacific Railroad (CC&P) in 1995. In 1988, the ICG was reorganized as the Illinois Central Railroad (IC). In 1996, the CC&P was repurchased by IC and in 1998, IC was purchased by the Canadian National Railway (CN). Today, CN operates the Dubuque Subdivision between Dubuque and Waterloo, Iowa; the Waterloo Subdivision between Waterloo and Fort Dodge, and the Cherokee Subdivision between Fort Dodge and Sioux City.
Located near Main Street in Cedar Falls, this attractive Pratt through truss bridge carries a former Illinois Central Railroad mainline over the Cedar River. Construction on the first bridge at this location was started in 1862, and was completed in December 1864. This bridge consisted of three 148-foot covered Howe through truss spans, set onto stone substructures. It is unclear if this bridge was ever replaced, although several sources suggest it was only occasionally repaired. Starting in the late 1890s, the IC decided to replace aging timber bridges along this line with new steel and concrete structures. In the fall of 1899, construction on a replacement bridge at this location began, with work substantially completed by the end of the year. As part of the work, three new steel truss spans were installed on the original stone substructures, which were also repaired as necessary. In 1918, the piers and abutments were reinforced with concrete jackets due. Further alterations were made in 1949, when the concrete jackets and stone substructures were extensively repaired. The most recent alteration to the bridge came in 2024-25, when the truss spans were strengthened with additional steel members, giving the bridge its present configuration. Currently, the bridge consists of three 148-foot, 6-panel, pin-connected Pratt through truss spans, set onto concrete encased stone substructures.
The truss spans follow a typical design for the era, with built-up members, a standard floor system and a double intersection lattice portal. Both the top chord and endpost use a built-up design, consisting of two channels joined by a solid plate on the exterior and X-lacing on the interior. The bottom chord is constructed out of a similar style beam, which uses X-lacing on both sides. The vertical members of the truss use V-laced beams, while the diagonal members use an eyebar design. During the 2025 strengthening, additional chords were added along the diagonal members, additional plates were added along the endposts and vertical members and new gusset plates installed at the connections to supplement the pinned connections. Originally the floor system consisted plate girder stringers set above the bottom chord with two plate girder stringers. As part of the 2025 alterations, the floor system was replaced by heavier beams of a similar design, with additional diagonal bracing between the stringers and vertical members. The portal bracing consists of an IC-standard design, with L-shaped bars formed into a double intersection lattice design with four bays. The sway bracing consists of tightly X-laced beams. Both the upper and lower lateral bracing consist of L-shaped bars formed into an X shape. The piers use a standard rectangular shape, with an angled upstream nose. Both abutments use a standard U-shaped design with a rectangular front portion. All portions of the original stone substructures have been encased in concrete. Stone for the substructures reportedly consists of a native stone quarried from the riverbed during the construction of the bridge.
American Bridge Works fabricated the superstructure, while an unknown contractor constructed the original stone substructures. It is unclear if the 1918 jacketing was completed by railroad company forces or by an unknown contractor. The 1949 repairs to the substructures were completed by the Gould Construction Company. The Pratt truss pattern was arguably the most popular railroad truss bridge design during the second half of the 19th Century. This design provided a durable and strong structure, while keeping the design simple and economical. American Bridge Works had the contract for many of the major bridges along this line that were constructed between 1899 and 1900. This firm also fabricated dozens of bridges for use on all areas of the IC system during the late 1890s. Today, the bridge remains in regular use as part of a Canadian National Railway mainline. Since the early 2010s, CN has invested significant capital in upgrading the truss bridges along this line. Instead of replacing the spans, they are retrofitted and strengthened, keeping almost all of the original components intact. This cost-effective method allows for the bridges to meet modern requirements while maintaining their historic nature. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being moderately significant, due to the truss design and size.
Citations
| Build date and builder (superstructure) | American Bridge Works plaque |
| Build date (substructure) | Illinois Central Gulf Railroad Iowa Division 1973 Track Profile |
| Builder (1949 repairs) | The Waterloo Courier; August 21, 1949 |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |