| Name | IAIS Perry Street Bridge Chicago, Rock Island & Pacific Railroad Bridge #1827 |
| Built By | Chicago, Rock Island & Pacific Railway |
| Currently Owned By | Iowa Interstate Railroad |
| Superstructure Contractor | Unknown |
| Substructure Contractor | Unknown |
| Length | 95 Feet Total, 60 Foot Main Span |
| Width | 2 Tracks, 1 In Use; Formerly 3 Tracks |
| Height Above Ground | 11 Feet 0 Inches |
| Superstructure Design | Through Plate Girder and Steel Stringer |
| Substructure Design | Concrete and Steel Bent |
| Date Built | 1902 |
| Traffic Count | 5 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago, Rock Island & Pacific Railroad Bridge Number | 1827 |
| Iowa Interstate Railroad Bridge Number | 182.68 |
| Significance | Local Significance |
| Documentation Date | 12/27/2012; 9/10/2017 |
In 1856, the Mississippi and Missouri Rail Road Company (M&M) constructed 55 miles of new railroad, extending from Davenport, Iowa to Iowa City, Iowa. As part of the work, a wooden bridge was constructed across the Mississippi River, connecting Rock Island, Illinois and Davenport. In 1862, the line was extended an additional 31 miles to Marengo, Iowa; followed by an additional 20 miles to Brooklyn, Iowa in 1863 and 26 miles to Kellogg, Iowa in 1864. In 1866, the M&M and the Chicago and Rock Island Rail Road Company (C&RI) merged to form the Chicago, Rock Island & Pacific Railroad (Rock Island), which constructed an additional 44 miles to Des Moines, Iowa in 1867. In 1869, the line would continue to be extended west towards the Missouri River. At Davenport, this line connected to an existing Rock Island line, which extended east to Chicago, Illinois. In 1880, the Rock Island was reorganized as the Chicago, Rock Island & Pacific Railway. The Rock Island constructed and acquired a large network of railroads, primarily in Iowa during the late 1880s. This line became part of the principal mainline of the Rock Island, and allowed for further development of branch lines throughout central Iowa and eventual expansion west of the Missouri River.
In the late 19th Century, several improvements were made to the line, including revising grades, curves and replacing wooden bridges with stone and iron structures. Due to heavy traffic over this line, portions of the line between Davenport and West Liberty was double tracked in the late 1890s. The Rock Island struggled financially throughout much of its history, experiencing repeated bankruptcies and chronic instability. After World War II, the Rock Island struggled to survive, proposing mergers and deferring maintenance on their routes. The railroad reorganized as the Chicago, Rock Island & Pacific Railroad in 1948. By the mid-1970s, the railroad was in serious decline. The railroad secured loans to eliminate slow orders, acquired new equipment, and attempted to restore profitability. Several sections of this line had fallen into serious disrepair, hampering the Rock Islands ability to maintain efficient operations. In 1978, the railroad came close to profit, but creditors were lobbying for a complete shutdown of the Rock Island. During the fall of 1979, a strike crippled the railroad, and by January of 1980, the entire system was ordered to be shut down and liquidated. Many of the lines and equipment were scrapped. Profitable sections of railroad were prepared for sale.
In November 1981, the Iowa Railroad Company (IARR) began operations over the former Rock Island mainline in western Iowa. In June 1982, the IARR entered into a two-year lease for the entire Rock Island mainline between Bureau, Illinois and Council Bluffs, Iowa; including the Davenport to Des Moines section. In 1983, concerns had grown over the ability of the IARR to provide reliable service to shippers along the line, and several industries came together to form Heartland Rail Corporation, which purchased the line between Bureau and Council Bluffs from the Rock Island trustees. Iowa Interstate Railroad (IAIS) was chosen to operate the line, and began operations in late 1984. After years of thin profit margins, IAIS began making significant financial strides in the 1990s and early 2000s, eventually becoming a major railroad in central Iowa. Increased profit margins and large grants meant IAIS could rebuild deteriorated track, improve bridges and expand operations. Today, IAIS continues to operate the Iowa City Subdivision between Davenport and South Amana, as well as the Newton Subdivision between South Amana and Des Moines.
Located along 5th Street in Davenport, this through plate girder bridge carries a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over Perry Street. Between 1856 and 1902, a grade crossing existed at this location as the Rock Island came off the large embankment required by the Mississippi River bridge. In 1899, the Rock Island and the City of Davenport reached an agreement to elevate the Rock Island tracks through the central business district of the city in conjunction with constructing a new depot between Main Street and Harrison Street. This solution was well received by the City, and was modeled after successful track elevation programs in the City of Chicago. Work on the track elevation project began in late 1901, and was completed by mid-1903. As part of the work, a three-track bridge was installed at this location, and the northern track was later removed. Currently, the bridge consists of a double track 60-foot through plate girder span, approached by a 15-foot steel stringer span on the east end and an 18-foot steel stringer span on the west end. Both abutments are constructed of concrete, while the piers use steel bents set onto concrete pedestals. In addition, the bridge is skewed, located on a heavy curve and was originally constructed for three tracks. The main span uses a standard design, consisting of three heavy plate girders, curved girder ends and a ballast deck composed of several parallel I-beam floorbeams covered by a concrete deck. Each approach uses a shallow stringer design with a similar ballast deck. Both piers use three columns connected by lattice bracing at the top, while the abutments are built into retaining walls. The east abutment also appears to incorporate brick and rubble stone, possibly to save on concrete costs. American Bridge Company fabricated the superstructure, while it is unclear if the substructure was constructed by railroad company forces or by an unknown contractor. It is known that a a local firm called the Peoples Construction Company had some involvement in the track elevation project, although it is possible this involvement was limited to grading and paving the streets underneath. This style of bridge was popular for 20th Century grade separations, as it was easy to construct, economical and maintained a safe passage for the public beneath. Since the initial construction, the only major alteration to the bridge came in 1949, when the northern track was removed. Today, only the north track remains in use as part of an Iowa Interstate Railroad mainline. Overall, the bridge appears to be in fair condition, with some deterioration noted to the superstructure and substructure. The author has ranked this bridge as being locally significant, due to the common design.
Citations
| Build date and builder (superstructure) | The Davenport Times; April 28, 1902 |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |