Built By La Crosse & Milwaukee Railroad
Currently Owned By State of Wisconsin (Operated by Wisconsin & Southern Railroad)
Superstructure Contractor Unknown
Length 4 Feet Total
Width 1 Track (32 Feet)
Height Above Ground 5 Feet (Estimated)
Superstructure Design Stone Arch Culvert
Substructure Design Stone Masonry
Date Built c. 1860
Traffic Count 4 Trains/Day (Estimated)
Current Status In Use
Chicago, Milwaukee & St. Paul Railway Bridge Number D-105 1/2
Significance Local Significance
Documentation Date 4/6/2024

In 1852, the La Crosse & Milwaukee Railroad (LC&M) began construction on a new line, extending from Milwaukee, Wisconsin to Portage, Wisconsin.  The first 9 mile section of railroad opened in 1853, and included a portion of line along the north bank of the Menomonee River and present-day 30th Street to North Milwaukee.  By 1855, another 46 miles would be completed to Horicon, Wisconsin.  By 1857, an additional 43 miles would be completed to Portage, Wisconsin.  Throughout the remainder of the 1850s, the LC&M continued west, eventually reaching La Crosse, Wisconsin by the end of 1858.  This line became the Eastern Division of the LC&M, which served as the first significant connection between Milwaukee and La Crosse.  The railroad was sold at a foreclosure sale, and was acquired by the Milwaukee & St. Paul Railway (M&StP) in 1867.  In 1874, the M&StP changed its name to the Chicago, Milwaukee & St. Paul Railway (Milwaukee Road).

With the completion of a new line between Milwaukee and Portage via Watertown in 1864, this route diminished in significance.  During the late 19th Century, the Milwaukee Road acquired and constructed a vast railroad network throughout the Midwest.  A second track was constructed at points throughout Milwaukee in the late 19th Century.  In addition, this line provided the opportunity for new branch lines to be constructed.  One such line was a branch to Fox Lake, which had been constructed as a horse-drawn railroad shortly after the railroad passed south of the town.  This line was converted to a standard gauge steam railroad in 1884.  An additional spur at Beaver Dam served the central business district, and larger branch lines extended from Iron Ridge and Horicon, and served Fond du Lac and Oshkosh, respectively.  In 1908, the western end of this line at Portage was realigned to improve operations in the city.  In the early 20th Century, the 30th Street line would be grade separated by constructing underpasses and overpasses.  

The Milwaukee Road was often in financial trouble, especially after the costly Pacific Extension was completed in 1909. In 1925, the company declared bankruptcy, and reorganized as the Chicago, Milwaukee, St. Paul and Pacific Railroad in 1928. Throughout the 20th Century, financial conditions for the Milwaukee Road continued to deteriorate.  This line began to fall into disrepair, and was downgraded to a branch line.  The railroad again entered bankruptcy in 1977, and was forced to liquidate unprofitable lines.  The line from North Milwaukee to Cambria was sold to the State of Wisconsin in 1980, which leased it to the Wisconsin & Southern Railroad (WSOR) the same year.  In the early 1980s, the segment between Cambria, Wisconsin and Portage would be abandoned.  By 1985, a suitor for the Milwaukee Road was being sought, and the Soo Line Railroad, controlled by Canadian Pacific Railway (CP) purchased the Milwaukee Road in 1986. The Soo Line continued to operate a short segment of this line between North Milwaukee and 1st Street.  In 2007, WSOR began to lease and operate a segment between North Milwaukee and Miller Valley, and outright purchased the line in 2020.  CP merged with Kansas City Southern Railway in 2023 to form CPKC.  Today, WSOR operates the Milwaukee Subdivision between Miller Valley and Horicon; and the Cambria Subdivision between Horicon and Cambria.  CPKC continues to operate the line between 1st Street and Miller Valley in Milwaukee.


Located along County Road N west of Rubicon, this small stone arch culvert carries the former Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) line over an unnamed creek. The first bridge at this location was a timber pile trestle, constructed when the line was first built. In the late 1850s and early 1860s, the La Crosse & Milwaukee Railroad worked to replace timber pile trestle bridges with stone structures. The present structure was constructed in approximately 1860. Currently, the culvert consists of a 4-foot by 4-foot stone arch culvert, set exclusively onto stone substructures. The culvert uses a standard semicircular design, with wing walls extending mainly perpendicular to the track. An unknown contractor constructed the culvert, and it appears that the structure uses a rubble-quality stone quarried locally. Stone culverts were popular with railroads in the 19th Century, as they provided a durable and easy to construct design. Since the initial construction, there appear to have been no significant alterations to the structure, and it remains in regular use. Overall, the culvert appears to be in fair to poor condition, with significant cracking and loss of stone. The author has ranked this culvert as being locally significant, due to the common design.