| Name | UP Waukesha Avenue Bridge Chicago & North Western Railway Bridge #2428 |
| Built By | Milwaukee, Sparta & North Western Railway |
| Currently Owned By | Union Pacific Railroad |
| Superstructure Contractor | Pennsylvania Steel Company of Steelton, Pennsylvania (Through Girder Span) Morava Construction Company of Chicago, Illinois (Deck Girder Span) |
| Substructure Contractor | Cleary-White Construction Company of Chicago, Illinois |
| Length | 125 Feet Total, 73 Foot Main Span |
| Width | 2 Tracks, 1 In Use |
| Height Above Ground | 20 Feet (Estimated) |
| Superstructure Design | Through Plate Girder and Deck Plate Girder |
| Substructure Design | Concrete and Steel Bent |
| Date Built | 1911 |
| Traffic Count | 5 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago & North Western Railway Bridge Number | 2428 |
| Union Pacific Railroad Bridge Number | 306.10 |
| Significance | Local Significance |
| Documentation Date | 2/11/2023 |
In 1884, the Princeton & Western Railway (P&W) constructed a 13 mile branch from the existing Chicago, St. Paul, Minneapolis & Omaha Railway (Omaha Road) at Wyeville, Wisconsin to Necedah, Wisconsin. The railroad soon came under lease of the Chicago & North Western Railway (C&NW). During the early 20th Century, the C&NW began a program of improvements, constructing new cutoffs and significantly increasingly efficiency over the system, particularly in Wisconsin and northern Illinois. In 1910, the Milwaukee, Sparta & North Western Railway (MS&NW), a subsidiary of the C&NW, began construction a new cutoff across central Wisconsin. In 1912, the MS&NW completed 23 miles between Sparta, Wisconsin and Wyeville, Wisconsin; as well as 133 miles between Necedah and Wiscona, a railroad junction on the north side of Milwaukee. The P&W was sold to the MS&NW in 1912, which was promptly consolidated into the C&NW. This line provided a better connection for the C&NW through Wisconsin, and avoided the steep grades of the previous mainline from Sparta to Madison. The line also improved the C&NW connection to the Twin Cities of Minneapolis and St. Paul by way of the C&NW controlled Omaha Road. The line between Butler, Wisconsin and Clyman Junction, Wisconsin would be double tracked; while the remainder between Clyman Junction and Wyeville was built wide enough for a second track, but no second track was installed.
By the 1920s, the C&NW was operating an expansive railroad network throughout the Midwest, radiating north and west from Chicago. This line served as one of the principal mainlines of the railroad, connecting Milwaukee to the Twin Cities. In 1959, much of the second track between Butler and Clyman Junction was removed as operations over the line no longer warranted a second track. The line remained largely unchanged until March 1973, when a tunnel collapsed at Tunnel City, Wisconsin. This led to the line being abandoned west of Tunnel City, and a new connection track being constructed to the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) mainline, which the C&NW would use to reach Winona, Minnesota. In 1995, the C&NW was purchased by the Union Pacific Railroad, the current owner of this line. Today, UP operates the Wyeville Subdivision between Wyeville and Adams, Wisconsin; the Adams Subdivision between Adams and Wiscona; and the Winona Subdivision between Wyeville and Tunnel City. The segment between Tunnel City and Sparta remains abandoned, although much of the infrastructure remains intact.
Located in Sussex, this through and deck plate girder bridge carries the former Chicago & North Western Railway mainline over Waukesha Avenue and the Bugline Trail (former Chicago, Milwaukee, St. Paul & Pacific Railroad). Built in 1911 as subsidiary Milwaukee, Sparta & North Western Railway constructed a new line through the area, the bridge consists of a double track 52-foot deck plate girder span and a 73-foot through plate girder span, set onto concrete abutments and a steel bent pier. The deck plate girder span uses a standard design, with two heavy girders and an open deck. The through girder span also uses a design replicated at several points along the C&NW, with heavy girders, a ballast deck floor composed of numerous parallel I-beams and rounded and tapered girder ends. The abutments use a typical design, with large U-shaped abutments. The pier is constructed of three steel columns, connected by a plate girder at the top and supported by three concrete pedestals. Morava Construction Company fabricated the deck girder span and Pennsylvania Steel Company fabricated the through girder span, while the Cleary-White Construction Company constructed the substructure. Through and deck girder spans were commonly used by railroads, as they were durable and easy to construct. While the bridge was initially built for two tracks, the south track was removed in 1959, and the superstructure remains intact. Since the initial construction, the bridge has seen few alterations, and remains in regular use. Overall, the bridge appears to be in fair condition, with some spalling noted on the substructure. The author has ranked this bridge as being locally significant, due to the common design.
Citations
| Builders and build date | Chicago & North Western Railway Valuation Notes at the Chicago & North Western Historical Society Archives |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |