| Name | BNSF East Channel Bridge Great Northern Railway Bridge #A-1.1 |
| Built By | Great Northern Railway |
| Currently Owned By | BNSF Railway |
| Superstructure Contractor | Edge Moor Bridge Works of Wilmington, Delaware (North Track) Wisconsin Bridge & Iron Company of North Milwaukee, Wisconsin (South Track) |
| Substructure Contractors | Ring & Tobin of Minneapolis, Minnesota |
| Length | 225 Feet Total, 75 Foot Main Spans |
| Width | 2 Tracks |
| Height Above Ground | 20 Feet (Estimated) |
| Superstructure Type | Deck Plate Girder and Concrete Modular Girder |
| Substructure Type | Stone Masonry |
| Date Fabricated | 1893 (North Track) 1925 (South Track) |
| Date Erected | 1924 |
| Date Replaced | 2008 (South Track) |
| Traffic Count | 20 Trains/Day (Estimated) |
| Current Status | Open to Traffic |
| Great Northern Railway Bridge Number | A-1.1 |
| BNSF Railway Bridge Number | A1.1 |
| Significance | Local Significance |
| Documentation Date | 10/11/2011; 11/28/2013; 4/4/2015 |
In 1867, the First Division of The St. Paul and Pacific Railroad Company constructed 14.70 miles of new railroad between Minneapolis, Minnesota and Lake Junction (Wayzata). Work would continue westward in 1868, with an additional 29 miles constructed to Howard Lake, Minnesota. Work resumed in 1869, with 49 more miles constructed, reaching Willmar, Minnesota. Work resumed in 1870, with 31 more miles constructed to Benson, and an additional 81 miles would be constructed to Breckenridge, Minnesota; located on the western Minnesota border. The railroad would be sold to the St. Paul, Minneapolis & Manitoba Railway (StPM&M) in 1879.
During the 1880s, the StPM&M would acquire and construct a large amount of railroad lines throughout Minnesota. Owned by railroad magnate James J. Hill, the railroad would continue to grow into the 1890s, before being sold to the Great Northern Railway (GN) in 1907. The GN, like the StPM&M, was owned by James J. Hill, and the railroad would eventually reach the Pacific Coast at Seattle in 1893. The GN utilized this as a mainline, connecting the railroad town of Willmar to the Twin Cities, and to agricultural markets in Western Minnesota. In 1970, GN merged with rival Northern Pacific Railway and Chicago, Burlington & Quincy Railroad to form Burlington Northern Railroad. BN was in turn merged with Atchison, Topeka & Santa Fe Railway in 1996, to form BNSF Railway. BNSF currently operates the Minneapolis to Willmar portion of this line as the Wayzata Subdivision.
Located on the east side of Nicollet Island in Minneapolis, this deck plate girder bridge carries a former Great Northern Railway mainline over the East Channel of the Mississippi River. The first bridge at this location was a timber pile trestle and truss bridge, constructed when the line was first built. This bridge was likely renewed at least once in the 19th Century with a similar wooden structure. Between 1892 and 1893, the GN upgraded the bridges at Nicollet Island as part of a larger improvement project in Minneapolis. In 1893, a new double track deck plate girder bridge, set onto stone substructures was completed at this location. By the 1920s, the bridge had become too light for traffic, and would require replacement. Instead of constructing an entirely new bridge, it was decided to combine the old girders into double strength spans to be used under the north track, and install a new set of girders for the south track. The most recent alteration came in 2008, when the south track spans were replaced by new precast modular concrete girder spans as part of the now-defunct Northstar Commuter Rail project, giving the bridge its present configuration. The old south track spans were stored at the Cedar Lake Yard in St. Louis Park until late 2014 or early 2015, when they were removed. It is unknown if they were scrapped, or reused elsewhere.
Currently, the bridge consists of three 75-foot spans, set onto stone substructures. The north track consists of twinned iron deck plate girder spans, while the south track consists of concrete modular concrete girder spans. The north track spans use a modified design, with four heavy plate girders and an open deck, while the south track spans consist of four large concrete girders and a ballast deck. The piers use a standard rectangular design with angled noses, while the abutments use stepped wing walls which extend diagonally from the bridge. Stone for the substructures consists of tan Kettle River sandstone, quarried at Sandstone, Minnesota. Edge Moor Bridge Works fabricated the iron girders for the north track, while it is unclear if railroad company forces or an unknown contractor completed the alterations. The original south track spans were fabricated by Wisconsin Bridge & Iron Company, while local contractor Ring & Tobin constructed the substructures. Deck plate girder spans were popular for railroad use, as they were durable and easy to construct. Twinned girder spans were popular with railroads, as they allowed for a stronger span without requiring significant amounts of new material. However, it is somewhat unusual for these types of spans to be located on mainlines. The type of modular concrete girder spans used for the south track have become popular in the 21st Century, particularly for longer spans. Since the 2008 alterations, the bridge has seen no significant changes, and remains in regular use. Overall, the bridge appears to be in fair condition, with no significant deterioration. The author has rated the bridge as being locally significant, due to the common design.
Citations
| Build Dates | Great Northern Willmar Division Bridge Index, located at the Minnesota Historical Society |
| Builder (substructure and north track superstructure) | The Railroad Gazette; January 20, 1893 |
| Builder (south track superstructure) | Wisconsin Bridge & Iron Company plaque |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |