UP Raccoon River Bridge (Hollingsworth Spur)


Click the photo to view the full-size version

1/37
Date Taken:
Author:
Caption:

Name UP Raccoon River Bridge (Hollingsworth Spur)
Built By Minneapolis & St. Louis Railway
Union Pacific Railroad
Currently Owned By Union Pacific Railroad
Superstructure Contractor Wisconsin Bridge & Iron Company of North Milwaukee, Wisconsin (Main Span)
Unknown (Approach Spans)
Length 307 Feet Total, 100 Foot Main Span
Width 1 Track
Height Above Ground 15 Feet (Estimated)
Superstructure Design Deck Plate Girder and Steel Stringer
Substructure Design Steel Pile
Date Fabricated 1919 (Main Span)
c. 1930 (Approach Spans)
Date Erected 1919 (Main Span)
2004 (Approach Spans)
Original Locations (Approach Spans) Unknown (See Below)
Traffic Count Less Than 1 Train/Day (Estimated)
Current Status In Use
Minneapolis & St. Louis Railway Bridge Number 4
Significance Local Significance
Documentation Date 2/21/2020

In the late 1850s and 1860s, the Des Moines Valley Railroad (DMV) and predecessors had constructed a significant railroad line, connecting Keokuk, Iowa and Des Moines, Iowa.  Between 1869 and 1870, the DMV continued constructing northwest from Des Moines; completing 82 miles to Tara, Iowa.  In 1873, the DMV was split into two separate sections, with the Keokuk, Iowa to Des Moines segment being sold to the Keokuk & Des Moines Railway (later leased/owned by the Chicago, Rock Island & Pacific Railway); and the Des Moines to Tara segment being sold to the Des Moines & Fort Dodge Railroad (DM&FD).  In 1882, the DM&FD completed an additional 50 miles, reaching Ruthven, Iowa.  In 1887, the DM&FD was leased by the Rock Island, and the Minneapolis & St. Louis Railroad (M&StL) began leasing the line in 1905.  In 1915, the DM&FD was outright purchased by the M&StL.  This line served as a secondary mainline for the M&StL, connecting to other secondary mainlines at Fort Dodge and Ruthven.  Between Fort Dodge and Tara, the M&StL obtained trackage rights over the Illinois Central Railroad to connect their lines.  Between Ruthven and Spencer, Iowa; the M&StL obtained trackage rights over the Chicago, Milwaukee & St. Paul Railway (Milwaukee Road) to connect their lines.  At Des Moines, the line connected to a jointly-owned line with the Chicago, Burlington & Quincy Railroad (CB&Q), which connected this line to the principal mainline at Oskaloosa, Iowa.

The M&StL was a small midwestern railroad, connecting Minneapolis, Minnesota to Peoria, Illinois.  The M&StL mainly served as a bridge railroad, allowing eastern and western railroads to interchange while bypassing the congested terminals at Chicago.  Because the M&StL had light freight density and limited passenger service, the railroad survived on razor thin margins and often was in financial stress.  The M&StL would later reorganize as the Minneapolis & St. Louis Railway in approximately 1920.  Through the 1930s, the railroad focused on trimming excess routes and improving the financial situation.  After leaving receivership in 1943, the M&StL invested significant capital upgrading infrastructure and modernizing equipment.  By the 1950s, it became clear that the M&StL would need to merge with a larger railroad to survive.  In 1960, the M&StL was purchased by the Chicago & North Western Railway (C&NW) during one of the first major railroad consolidations in the second half of the 20th Century.  

Because of the agricultural industries connected to this line, significant sections of line remained profitable far longer than other M&StL lines.  In 1981, the Mallard to Ruthven segment was abandoned, followed by the Rippey to Grand Junction segment in 1984.  In 1989, the segment between Perry and Rippey would be abandoned.  In 1995, the C&NW was purchased by Union Pacific Railroad (UP).  In 2004, the line between Waukee and Perry would be abandoned.  Today, UP operates the Tara Subdivision between Grand Junction and Rippey and the Waukee Industrial Lead between Des Moines and Waukee.  The segment between Waukee and Perry has been reused as part of the Raccoon River Valley Trail.  The remainder of the line has been abandoned and reverted to adjacent landowers.


Located near Valley Junction in Des Moines, this deck plate girder and steel stringer bridge carries a former Minneapolis & St. Louis Railway spur across the Raccoon River. Little is known about the history of this bridge. It is believed that a previous bridge at this location was constructed in 1878 to serve a coal mine nearby. This bridge likely consisted of a timber pile trestle structure. It is believed that the bridge was renewed in-kind at least once. In 1918, the M&StL decided to rebuild the bridge with a large center span, likely to improve flooding and driftwood issues. Work on the project began in late 1918, and was completed in 1919. Initially, the bridge consisted of a 100-foot deck plate girder span, set onto concrete piers and approached by timber pile trestle spans on either end. Koss Construction Company was reportedly the contractor for constructing the concrete piers. Throughout the remainder of the 20th Century, the approaches of the bridge were renewed with in-kind materials. In approximately 2000, aerial photos show a series of steel stringer spans laid out near the south end of the bridge, which were to be installed to replace the original approaches. After a flood in the early 2000s, Union Pacific Railroad began the project of completely rehabilitating the bridge in 2004. As part of the work, the original concrete piers would be demolished, new piers constructed and the approaches rebuilt with a series of secondhand steel stringer spans, acquired from a variety of unknown locations. Currently, the bridge consists of a 100-foot deck plate girder span, approached by four steel stringer spans on the south end and three steel stringer spans on the north end. The entire bridge is set onto steel pile bents and piers.

Span No. Design Fabrication Date Builder Original Location
1 30' steel stringer (2x2) c. 1930 Unknown Unknown
2 32' steel stringer (2x2) c. 1930 Des Moines Steel Co? Unknown
3 18' steel stringer (2x2) c. 1930 Unknown Unknown
4 24' steel stringer (2x2) c. 1930 Unknown Unknown
5 100' deck plate girder 1919 Wisconsin Bridge & Iron Company N/A
6 45' steel stringer (2x2) c. 1930 Unknown Unknown
7 42' steel stringer (2x2) c. 1930 Unknown Unknown
8 16' steel stringer (3x2) c. 1930 Unidentified Plaque Unknown
List of spans

The main span of the bridge follows a heavy design, consisting of two massive plate girders and an open deck. Except for the north span (span #8), the approach spans all generally use an arrangement of four beams, arranged into two sets of two. The north span (span #8) consists of six beams, arranged into two sets of three. All of the approach spans appear to have originally been constructed in approximately 1930, and were reused from as many as seven unknown locations. Because UP supplied the beams, it is also unclear if the spans were originally constructed for the UP; M&StL; the Chicago & North Western Railway (C&NW); the Chicago Great Western Railway (CGW); the Chicago, Rock Island & Pacific Railroad (Rock Island) or any other railroad that was eventually acquired by UP. It is also possible that these spans had been salvaged from an abandoned line, from a replaced bridge or from an unused second track. All substructures of the bridge are constructed from steel H-piles, and concrete backwalls are used at the abutments. Wisconsin Bridge & Iron Company fabricated the main span; while multiple unknown contractors fabricated the approach spans. It is believed that the steel substructures were constructed by railroad company forces. Missing plaques are present on span #2 and span #8. Deck plate girder and steel stringer spans were popular for railroad use, as they were durable and easy to construct. Railroads have been reusing steel and iron bridge spans since the 19th Century, as it provided a cost effective way to upgrade bridges without requiring large amounts of new material. Today, the bridge remains in use as a spur to serve a cement plant. Overall, the bridge appears to be in good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the unknown history and common design.


Citations

Build date (main span) Annual Report of the Minneapolis & St. Louis Railway Company; 1918
Builder (main span) Missing Wisconsin Bridge & Iron Company plaque
Erection date (approaches) Aerial photos
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele