| Name | UP Newbold Street Bridge Chicago, Rock Island & Pacific Railroad Bridge #450 |
| Built By | Chicago & North Western Railway |
| Currently Owned By | Union Pacific Railroad |
| Superstructure Contractor | Worden-Allen Company of Milwaukee, Wisconsin |
| Length | 89 Feet Total, 35 Foot Main Span |
| Width | 1 Track |
| Height Above Ground | 13 Feet 6 Inches |
| Superstructure Design | Steel Stringer and Timber Pile Trestle |
| Substructure Design | Steel Pile and Timber Pile |
| Date Built | 1984, Using a Span Fabricated 1949 |
| Current Status | In Use |
| Chicago, Rock Island & Pacific Railroad Bridge Number | 450 |
| Union Pacific Railroad Bridge Number | 45.00 |
| Significance | Minimal Significance |
| Documentation Date | 8/4/2019 |
In 1871, the Chicago & South Western Railway constructed 61 miles of new railroad between Shearwood, Missouri and Allerton, Iowa, as part of a larger project to construct a line between Leavenworth, Kansas and Washington, Iowa. In 1873, the Des Moines, Indianola & Missouri Railroad (DMI&M) constructed a 21 mile railroad line, extending from Des Moines, Iowa south to Avon, Iowa; and west to Indianola, Iowa. Both railroads would be sold to the Iowa Northern & Missouri Southern Railroad in 1876, which was merged into the Chicago, Rock Island & Pacific Railway in 1880. The Rock Island had acquired and constructed a network of railroads, particularly in Iowa. This route served as a branch line to a small town near Des Moines. During the 1880s and 1890s, the Rock Island expanded westwards, reaching Colorado and New Mexico. Additions to the system during the early 1900s included a number of new lines in Minnesota and northern Iowa. In 1911, the St. Paul & Kansas City Short Line Railroad, a subsidiary of the Rock Island, constructed 65 miles between Avon, Iowa and Allerton, Iowa; connecting the two lines. This new line was built as part of a larger project to connect the northern and southern portions of the system. To reach Kansas City, the Rock Island utilized trackage rights over the Chicago, Burlington & Quincy Railroad from Cameron Junction to Kansas City. In 1931, the Rock Island constructed a new line from near Trenton to Birmingham, located just outside of Kansas City. From Polo to Birmingham, the route would parallel the Chicago, Milwaukee, St. Paul & Pacific Railroad tracks, and the two railroads operated as a double track route, with separate mainlines. In 1945, a new bridge across the Missouri River was jointly constructed by the two railroads.
The Rock Island had constructed and acquired a large railroad network
throughout the Midwest. The Kansas City-Des Moines-St. Paul route would become known as the "Spine Line". After World War II, the Rock Island struggled
to survive, proposing
mergers and deferring maintenance on their routes. The Rock Island
struggled to compete with a stronger and better constructed Union
Pacific system. By 1964, the Rock Island began attempts to merge with
Union Pacific, and
restructure railroads west of the Mississippi River. This merger was
eventually denied, and Rock Island turned its last profit in 1965. In
the mid-1970s, the railroad was in serious decline. The railroad
received loans to attempt to fix slow orders, received new equipment and
turn a profit. By 1978, the railroad came close to profit, but
creditors were lobbying for a complete shutdown of the Rock Island.
During the fall of 1979, a strike crippled the railroad, and by January
of 1980, the entire system was ordered to be shut down and liquidated.
Many of the lines and equipment were scrapped. Profitable sections of
railroad were prepared for sale. The Chicago & North Western Railway (C&NW) and Soo Line both had
interest in the Spine Line, with the C&NW eventually purchasing the
route. During 1982 and 1983, significant money was allocated for
rebuilding the deteriorated route, and trains began using the route. In
1995, C&NW was purchased by Union Pacific Railroad (UP). Union
Pacific continues to operate this route as the Trenton Subdivision. CPKC now operates the former Milwaukee Road portion of this segment.
Located north of Melcher-Dallas, this steel stringer bridge carries a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over Newbold Street. The first bridge at this location was a timber pile trestle, which was periodically renewed through the 20th Century. After the bankruptcy of the Rock Island, the Chicago & North Western Railway (C&NW) acquired the Kansas City to St. Paul "Spine Line", which was severely deteriorated. Starting in 1981, the C&NW invested significant capital returning the route to acceptable condition, significantly reconstructing the line with new or repaired bridges, track and ballast. In 1984, the reconstruction project had reached Marion County. As part of the work, a new steel bridge was constructed to replace the original timber pile trestle bridge, using a secondhand steel stringer span. Currently, the bridge consists of a 35-foot steel stringer span, approached by two timber pile trestle spans on either end. The main span is supported by steel pile substructures, while the approaches are supported by timber pile bents. The main span follows a standard design for the era, with four shallow beams arranged into two sets of two and covered by a ballast deck. This span was originally fabricated in 1949 for use at an unknown location. It is unclear if this span came from a former C&NW line or a former Rock Island line, although the C&NW reused large amounts of secondhand material taken from abandoned lines during the 1980s. Upon relocation here, the span was partially rebuilt with new lateral bracing. The approaches use a standard timber pile trestle design, with a creosote ballast deck. Both main piers also use a standard design for the era, with concrete caps covering steel piles. Worden-Allen Company fabricated the main span, while the remainder of the bridge was likely constructed by railroad company forces. Steel stringer spans were popular for railroad use, as they were durable and easy to construct. Since the initial construction, the bridge has seen no significant alterations, and remains in regular use as part of a Union Pacific Railroad mainline. Overall, the bridge appears to be in good condition, although it is likely that the timber approaches will be replaced with modern concrete spans in the near future. The author has ranked the bridge as being minimally significant, due to the newer age and common design.
Citations
| Erection date | National Bridge Inventory (NBI) |
| Fabrication date and builder (main span) | Worden-Allen Company plaque |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |