Name CN Bridge #458.8
Illinois Central Railroad Bridge #WA458.8
Built By Illinois Central Railroad
Currently Owned By Canadian National Railway
Superstructure Contractor Unknown
Substructure Builder Illinois Central Railroad Company Forces
Length 80 Feet Total, 52 Foot Main Span
Width 1 Track
Height Above Ground 15 Feet (Estimated)
Superstructure Design Deck Plate Girder and Concrete Slab
Substructure Design Concrete
Date Built 1919, Using a Span Fabricated c. 1895
Original Location Unknown
Traffic Count 2 Trains/Day (Estimated)
Current Status In Use
Illinois Central Railroad Bridge Number WA458.8
Canadian National Railway Bridge Number 458.8
Significance Local Significance
Documentation Date 12/30/2018

Between 1857 and 1870, the Dubuque and Sioux City Railroad (D&SC) had acquired and constructed a mainline across central Iowa, extending from the Mississippi River at Dubuque, Iowa to the Missouri River at Sioux City, Iowa.  The D&SC had operated under lease from the Illinois Central Railroad (IC) since 1867, and connected to the IC system by using a bridge across the Mississippi River at Dubuque.  This line provided several opportunities for the construction of branch lines.  By the late 19th Century, the IC desired to enter the Council Bluffs, Iowa/Omaha, Nebraska markets.   In 1890, the Omaha Bridge & Terminal Railway (OB&T) began construction on a line extending between Council Bluffs, Iowa and Omaha, Nebraska.  A new bridge was constructed across the Missouri River between 1893 and 1894, with the goal of breaking the Union Pacific Railroad (UP) monopoly of traffic crossing the Missouri River at Omaha.  Between September 1898 and January 1900, the Fort Dodge and Omaha Railroad (FD&O) constructed a 131-mile railroad line, extending from the existing D&SC mainline at Tara, Iowa to Council Bluffs, Iowa.  The FD&O and OB&T were both leased by the D&SC/IC in 1899.

By the late 19th Century, the IC had developed and operated a sprawling railroad network in the central United States.  This line served as a secondary mainline for the company, connecting Chicago to the Missouri River at Omaha.  In the 20th Century, the IC had become a respected railroad, connecting several major cities in the central United States.  The D&SC was fully merged into the IC in 1946.  In 1972, the IC merged with the Gulf, Mobile & Ohio Railroad (GM&O) to form the Illinois Central Gulf (ICG).  The bridge across the Missouri River was placed out of service in approximately 1980, although the tracks remain today.  The entire IC system in Iowa, as well as the line between Dubuque and Chicago, were sold to the Chicago Central & Pacific Railroad (CC&P) in 1995.  In 1988, the ICG was reorganized as the Illinois Central Railroad (IC).  In 1996, the CC&P was repurchased by IC and in 1998, IC was purchased by the Canadian National Railway (CN).  Today, CN operates the Omaha Subdivision between Tara and Council Bluffs.


Located alongside US Highway 30 and the former Chicago & North Western Railway mainline southwest of Dow City, this deck plate girder and concrete slab bridge carries a former Illinois Central Railroad mainline over an unnamed creek. The first bridge at this location consisted of a timber pile trestle bridge, constructed when the line was first built. In the mid to late-1910s, the IC invested significant capital into this line, rebuilding many timber bridges with concrete and steel bridges. The present bridge was constructed in 1919, using a span fabricated in approximately 1895 for use at an unknown location. It is possible that this span was reused from the Hyde Park (Chicago) grade separations, which had identical spans that were reused throughout the system. These bridges were fabricated in 1892 by Detroit Bridge & Iron Works in advance of the 1893 Chicago Worlds Fair. As the IC expanded operations in Chicago, the grade separations were replaced with modern structures in the late 1910s and early 1920s. Many of the spans from these bridges were placed between 1915 and 1921, and several were used throughout the IC system. Currently, the bridge consists of a 52-foot deck plate girder span, approached by a 14-foot concrete slab span on either end. The entire bridge is set onto concrete pile substructures. The main span follows a light version of a standard design, with two plate girders, an open deck and less bracing than 20th Century deck plate girder spans. The approach spans use heavy concrete slabs, which have no decorative features. The substructures are constructed using octagonal piles with concrete caps. An unknown contractor fabricated the main span, while the remainder of the bridge was constructed by railroad company forces. Railroads often reused steel and iron spans, as it provided a cost effective way to upgrade bridges without requiring large amounts of new material. Deck plate girder spans were popular for railroad use, as they were durable and easy to construct. Concrete slab spans became popular in the early 20th Century, as they were durable, easy to construct and economical. Since the initial construction, the bridge has seen no significant alterations, and remains in regular use. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being locally significant, due to the common design and unclear history.


Citations

Erection date Illinois Central Gulf Railroad Iowa Division 1973 Track Profile
Builder (substructure and approaches) Company Forces stamp
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele