| Name | CN Boyer River Bridge #1 Illinois Central Railroad Bridge #WA439.4 |
| Built By | Illinois Central Railroad |
| Currently Owned By | Canadian National Railway |
| Superstructure Contractor | American Bridge Company of New York (Main Span) American Bridge Works of Chicago, Illinois (Approach Spans) |
| Substructure Contractor | George B. Swift Company of Chicago, Illinois (Original Substructures) Unknown (Concrete Alterations) |
| Length | 137 Feet Total, 77 Foot Main Span |
| Width | 1 Track |
| Height Above Ground | 20 Feet (Estimated) |
| Superstructure Design | Through Plate Girder and Deck Plate Girder |
| Substructure Design | Concrete |
| Date Built | 1899, Reconstructed 1954 |
| Traffic Count | 2 Trains/Day (Estimated) |
| Current Status | In Use |
| Illinois Central Railroad Bridge Number | WA439.4 |
| Canadian National Railway Bridge Number | 439.4 |
| Significance | Local Significance |
| Documentation Date | 12/30/2018 |
Between 1857 and 1870, the Dubuque and Sioux City Railroad (D&SC) had acquired and constructed a mainline across central Iowa, extending from the Mississippi River at Dubuque, Iowa to the Missouri River at Sioux City, Iowa. The D&SC had operated under lease from the Illinois Central Railroad (IC) since 1867, and connected to the IC system by using a bridge across the Mississippi River at Dubuque. This line provided several opportunities for the construction of branch lines. By the late 19th Century, the IC desired to enter the Council Bluffs, Iowa/Omaha, Nebraska markets. In 1890, the Omaha Bridge & Terminal Railway (OB&T) began construction on a line extending between Council Bluffs, Iowa and Omaha, Nebraska. A new bridge was constructed across the Missouri River between 1893 and 1894, with the goal of breaking the Union Pacific Railroad (UP) monopoly of traffic crossing the Missouri River at Omaha. Between September 1898 and January 1900, the Fort Dodge and Omaha Railroad (FD&O) constructed a 131-mile railroad line, extending from the existing D&SC mainline at Tara, Iowa to Council Bluffs, Iowa. The FD&O and OB&T were both leased by the D&SC/IC in 1899.
By the late 19th Century, the IC had developed and operated a sprawling railroad network in the central United States. This line served as a secondary mainline for the company, connecting Chicago to the Missouri River at Omaha. In the 20th Century, the IC had become a respected railroad, connecting several major cities in the central United States. The D&SC was fully merged into the IC in 1946. In 1972, the IC merged with the Gulf, Mobile & Ohio Railroad (GM&O) to form the Illinois Central Gulf (ICG). The bridge across the Missouri River was placed out of service in approximately 1980, although the tracks remain today. The entire IC system in Iowa, as well as the line between Dubuque and Chicago, were sold to the Chicago Central & Pacific Railroad (CC&P) in 1995. In 1988, the ICG was reorganized as the Illinois Central Railroad (IC). In 1996, the CC&P was repurchased by IC and in 1998, IC was purchased by the Canadian National Railway (CN). Today, CN operates the Omaha Subdivision between Tara and Council Bluffs.
Located in a rural area between Boyer and Deloit, this through and deck plate girder bridge is the first bridge carrying a former Illinois Central Railroad mainline over the Boyer River. When the railroad originally was constructed, the first bridge at this location consisted of a 75-foot and two 30-foot deck plate girder spans, set onto concrete substructures. The Boyer River had long experienced severe floods, and by the early to mid-20th Century it was decided to channelize the river. In 1954, the bridge was significantly rebuilt by replacing the center span with a through plate girder span to improve clearance underneath. As part of the work, the substructures were heavily modified and the entire bridge was rehabilitated with minor repairs and new paint. Currently, the bridge consists of a 77-foot through plate girder span, approached by a 30-foot deck plate girder span on either end. The entire bridge is set onto concrete substructures, and is located on a 2-degree curve. American Bridge Company fabricated the center span, while American Bridge Works fabricated the approach spans. George B. Swift Company constructed the original substructures, and it is unclear if the 1954 alterations were made by railroad company forces or by an unknown contractor.
The center span follows a standard design for the era, with two heavy plate girders, square girder ends and a standard floor. While welded and bolted construction was becoming more common by the 1950s, this span still is heavily riveted and uses a largely traditional design for the early 20th Century. The approach spans also use a standard design for the era, with two light plate girders and an open deck. Originally, the piers consisted of rectangular structures founded on timber piles. During the 1954 reconstruction, they were rebuilt with concrete additions on either side and a concrete riser to fit the through girder span. Both abutments use a standard U-shaped design with no wing walls, typical of some bridges along this line. The abutments have also been modified with concrete additions, likely indicating the bridge was also raised in 1954. Through plate girder spans were popular for railroad use, as they were durable and easy to construct. Since the 1954 reconstruction, the bridge has seen no significant alterations, and remains in regular use. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being locally significant, due to the common design.
Citations
| Build dates | Illinois Central Gulf Railroad Iowa Division 1973 Track Profile |
| Builder (main span superstructure) | American Bridge Company plaque |
| Builder (approach spans superstructure and original substructure) | Engineering News; Volume 43, Issue 4 |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |