Name | WSOR Bridge #276 Chicago & North Western Railway Bridge #276 |
Built By | Chicago & North Western Railway |
Currently Owned By | State of Wisconsin (Operated by Wisconsin & Southern Railroad) |
Superstructure Contractor | Worden-Allen Company of Milwaukee, Wisconsin |
Substructure Contractor | John A. & George Garden of Romeoville, Illinois |
Length | 16 Feet Total |
Width | 2 Tracks, 1 In Use |
Height Above Ground | 15 Feet (Estimated) |
Superstructure Design | Steel Stringer |
Substructure Design | Stone Masonry |
Date Built | 1951 |
Traffic Count | 2 Trains/Day (Estimated) |
Current Status | In Use |
Chicago & North Western Railway Bridge Number | 276 |
Wisconsin & Southern Railroad Bridge Number | 276 |
Significance | Minimal Significance |
Documentation Date | 6/24/2018 |
In 1860, the Beloit and Madison Railroad (B&M) constructed 17 miles of railroad, extending from Beloit, Wisconsin to Magnolia, Wisconsin. In 1864, the B&M constructed an additional 32 miles of railroad, extending from Magnolia to Madison, Wisconsin. In 1864, the Madison, Lodi and Baraboo Railroad (ML&B) began grading for a new railroad line, extending from Baraboo, Wisconsin to Merrimac, Wisconsin. The ML&B was acquired by the Baraboo Air Line Railroad (BAL) in 1870, and began construction on a line extending from Reedsburg, Wisconsin to Madison. In 1870, the La Crosse, Trempealeau and Prescott Railroad (LCT&P) constructed an additional 29 miles of railroad, extending from the Winona & St. Peter Railroad (W&StP) at Winona, Minnesota to the north side of La Crosse, Wisconsin; constructing a large bridge across the Mississippi River. The BA&L and the B&M were acquired by the Chicago & North Western Railway (C&NW) in 1871. The C&NW continued construction, eventually opening a 129 mile line between Madison and present-day Medary on the north side of La Crosse in 1873. This line was difficult to construct, as it crossed through areas of rugged terrain, requiring three tunnels and numerous wooden trestles. The LCT&P was purchased by the C&NW in 1876.
Soon after completion, this line became an important route for the C&NW. The line connected an existing mainline to Chicago with the existing W&StP mainline across southern Minnesota. In addition, the Chicago, St. Paul, Minneapolis & Omaha Railway (Omaha Road, a C&NW subsidiary) mainline ended at this line in Elroy, Wisconsin, providing the C&NW with a connection to the Twin Cities. Numerous improvements were made in the late 1870s and throughout the 1880s, including filling wooden trestles and replacing wooden bridges with iron and stone. The C&NW constructed a short 4-mile branch line from Medary to La Crosse in 1886. By the late 19th Century, traffic over this route had grown to the point that a second track was necessary. Between 1896 and 1899, the C&NW completed a second track between Evansville, Wisconsin and Elroy. By the early 20th Century, the C&NW was operating an expansive railroad network throughout the Midwest, radiating north and west from Chicago. This line initially served as one of the principal mainlines of the railroad, connecting Chicago to the Twin Cities and the mainline to South Dakota.
Between 1910 and 1912, the C&NW undertook a large construction program to construct shorter routes and streamline operations. A cutoff between Milwaukee and Sparta opened in 1911, reducing the importance of this line. Between 1953 and 1956, much of the double track would be removed. A portion of the line was abandoned between Elroy and Sparta in 1964, and became one of the United States first rail-trail projects. In 1978, the Sparta to Medary and Winona to Trempeleau, Wisconsin segments would be abandoned, followed by the Beloit to Evansville segment in 1979 and the Medary to Trempeleau and La Crosse segments in 1981. The Reedsburg to Elroy segment was abandoned in 1987. All of the line west of Reedsburg would be acquired by the Wisconsin Department of Natural Resources for trail use.
In 1995, the C&NW would be purchased by Union Pacific Railroad (UP). In 1996, UP leased the Fitchburg to Reedsburg segment to the Wisconsin & Southern Railroad (WSOR). In addition, UP attempted to abandon the Evansville to Fitchburg segment the same year. In response to possibly losing railroad service, the communities of Fitchburg and Oregon purchased the line, although it was out of service. In 2014, the State of Wisconsin acquired the Fitchburg to Reedsburg line, and contionued to lease it to WSOR. The same year, WSOR began operations over the Oregon to Fitchburg line, while the Evansville to Oregon segment remains out of service. Today, WSOR operates the Reedsburg Subdivision between Madison and Reedsburg. The 400 State Trail uses the former railroad between Reedsburg and Elroy; the Elroy-Sparta State Trail uses the former railroad between Elroy and Sparta; the La Crosse River State Trail uses the former railroad between Sparta and La Crosse; and the Great River State Trail uses the former line between Medary and Marshland.
View an article discussing this double tracking project (digitalized by Google)
Located on the north side of Waunaukee, this small steel stringer bridge carries the former Chicago & North Western Railway mainline over an unnamed creek near Kopp Road. The previous bridge at this location was likely a small timber pile trestle bridge. In 1896, the C&NW invested significant capital into this line, double tracking the route between Madison and Baraboo and constructing new steel and stone bridges. As part of the work, a new steel stringer bridge was constructed at this location. In 1951, the original superstructure was replaced by the present superstructure. It is unknown if the previous superstructure was reused elsewhere. Currently, the bridge consists of a double track 16-foot steel stringer span, set onto stone abutments. The steel stringer span uses a standard design, with shallow beams and four beams per track. The substructure also uses a standard design, with stepped wing walls extending perpendicular from the track and large stone blocks under the superstructure. Worden-Allen Company fabricated the superstructure, while John A. & George Garden constructed the substructure using stone quarried at Rock Springs, Wisconsin. Steel stringer spans were commonly used by railroads, as they were durable and easy to construct. Since the initial construction, the bridge has seen few alterations, and remains in regular use. Today, only the westernmost track remains in use. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being minimally significant, due to the common design and newer age.
Citations
Builder and build date | Worden-Allen Company plaque |
Builder (substructure) | The Railroad Gazette; January 24, 1896 |
Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |