| Name | UP 4th Street Bridge (Clinton) Chicago & North Western Railway Bridge #1 1/2 |
| Built By | Chicago & North Western Railway Chicago, Milwaukee & St. Paul Railway |
| Currently Owned By | Union Pacific Railroad |
| Contractors | White & Duffy of Milwaukee, Wisconsin (General Contractor) Joseph McCarty Construction Company of Kaukauna, Wisconsin (Concrete Subcontractor) |
| Length | 60 Feet Total, 40 Foot Main Span |
| Width | 7 Tracks, 3 In Use |
| Height Above Ground | 13 Feet 0 Inches |
| Superstructure Design | Concrete Encased Beam |
| Substructure Design | Concrete |
| Date Built | 1922 |
| Traffic Count | 60 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago & North Western Railway Bridge Number | 1 1/2 |
| Union Pacific Railroad Bridge Number | 137.26 |
| Significance | Local Significance |
| Documentation Date | 12/16/2017 |
In 1856, the Chicago, Iowa & Nebraska Rail Road (CI&N) began construction on a new mainline across Iowa, connecting an existing Galena & Chicago Union Railroad (G&CU) line at Fulton, Illinois to the Missouri River. To establish construction, a temporary ferry was installed across the Mississippi River at Clinton in 1856. In 1857, the first 44 miles were completed to Wheatland, Iowa. The following year, 20 miles were completed to Lisbon, Iowa; and in 1859, an addition 17 miles were completed to Cedar Rapids, Iowa. In 1861, the Cedar Rapids & Missouri River Railroad (CR&MR) constructed an additional 41 miles to Chelsea, Iowa; followed by 29 miles to Marshalltown, Iowa in 1862. After pausing in 1863, an additional 29 miles were completed to Nevada, Iowa in 1864, followed by 23 additional miles to Boone, Iowa in 1865. In 1864, both the CI&N and CR&MR were leased by the Chicago & North Western Railway (C&NW). In 1867, the line continued west from Boone, reaching the Missouri River at Council Bluffs, Iowa in 1867.
During the second half of the 19th Century, the C&NW had constructed and acquired a large amount of trackage throughout the Midwest. This line formed a principal mainline for the C&NW, connecting western railroads at Omaha to the railroad hub of Chicago. In 1884, the C&IN and CM&MR were formally acquired by the C&NW. In 1887, the Linn County Railway (LC) constructed a 6-mile cutoff, bypassing Cedar Rapids to the south between Otis, Iowa and Beverly, Iowa. At the end of the year, the LC was formally acquired by the C&NW. During the late 19th Century, several other improvements were made to this line. Between 1890 and 1891, a second track was constructed between Clinton and Lowden, Iowa; and between Libson and the Cedar River bridge. Between 1893 and 1894, a second track was constructed between Lowden and Lisbon. A second track was added to the original mainline through Cedar Rapids in 1898, and between 1898 and 1899, a second track was constructed between the Cedar River bridge and the west side of Marshalltown. In 1901, a second track was completed between Marshalltown and Boone, and new facilities were constructed at Boone. Throughout the 20th Century, the Cedar River bridge remained a gauntlet structure, severely hindering efficient operations.
By the 20th Century, the C&NW was operating an extensive railroad network, which radiated north and west from Chicago. This line served as the backbone of the C&NW, connecting transcontinental freight and passengers at Omaha to Chicago. Known as the Overland Route, this line became one of the most significant railroad routes in the United States. This route saw continuous upgrades during the 20th Century, including significant bridge, rail, tie and signal upgrades. In 1995, the C&NW was purchased by Union Pacific Railroad (UP). In 2002, UP constructed a second track at the Cedar River bridge, eliminating a single track bottleneck in the network. Today, this line remains vital to UP and is still well maintained. The Clinton to Boone segment is known as the Clinton Subdivision, and remains a heavily used double track mainline.
Located in Clinton, this concrete encased beam bridge carries a former Chicago & North Western Railway mainline over 4th Street. In 1917, the C&NW began a series of extensive terminal improvements in Clinton. Among the improvements were new facilities, expanded yards and grade separations on the approach to the Mississippi River bridge. After delays due to World War II, construction on grade separations over 2nd Street and 4th Street began in October 1921. The underpass at 4th Street was completed in August 1922. Work on the 2nd Street subway was started shortly after, and was completed in August 1923. Currently, the bridge at 4th Street consists of one 40-foot and two 10-foot concrete encased beam spans, set onto concrete substructures. The bridge was constructed for six Chicago & North Western Railway tracks and one Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) track on the north end. The superstructure follows a standard design for the era, with several precast concrete slabs formed around heavy steel stringers. The approach spans cross sidewalks, and are considerably deeper than the roadway span. The piers use a decorative design, consisting of several concrete columns, connected by concrete arches at the top. The abutments also use a modified standard design, with sloped wing walls. White & Duffy served as the general contractor for the structure as well as other improvements in Clinton, while the Joseph McCarty Construction Company completed the concrete work and paving for the structure. Railroad company forces placed the slabs and coordinated the work. Concrete encased beam spans were popular for grade separations, as they were durable, economical and required little maintenance. Since the initial construction, the bridge has seen no significant alterations. Today, Union Pacific Railroad operates two tracks, while CPKC operates one track. The remaining four tracks are unused. Overall, the bridge appears to be in fair condition, with some cracking and spalling throughout the structure. The author has ranked this bridge as being locally significant, due to the common design.
Citations
| Build date and builders | The Clinton Advertiser; August 18, 1923 |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |