Name | RCP&E Plum Creek Bridge Chicago & North Western Railway Bridge #1563 |
Built By | Chicago & North Western Railway |
Currently Owned By | Rapid City, Pierre & Eastern Railroad |
Superstructure Contractor | Clinton Bridge Works of Clinton, Iowa |
Length | 285 Feet, 70 Foot Main Span |
Width | 1 Track |
Height Above Ground | 15 Feet (Estimated) |
Superstructure Design | Through Plate Girder and Timber Pile Trestle |
Substructure Design | Timber Pile |
Date Built | 1931 |
Traffic Count | 2 Trains/Day (Estimated) |
Current Status | In Use |
Chicago & North Western Railway Bridge Number | 1563 |
Significance | Local Significance |
Documentation Date | 7/15/2017 |
In 1879, the Chicago and Dakota Railway (C&D) completed 46 miles
of new railroad from Tracy, Minnesota to Elkhorn, South Dakota. At
Tracy, the line connected to an existing railroad owned by the Winona
and Saint Peter Railway (W&StP), which was being leased by the
Chicago & North Western Railway (C&NW). At the same time, the
Dakota Central Railway (DC) completed an additional 25 miles from
Elkhorn to Volga, South Dakota in 1879. In 1880, 184 additional miles
would be completed by DC to Pierre. The C&D would come under
control of the Chicago & North Western Railway in 1881, and the
C&D, DC and W&StP would all be merged into the C&NW in 1900.
In 1905, Native American land west of the Missouri River opened to
settlement and development. The C&NW immediately began working on a
new line to reach the Black Hills. In 1906, 76 miles would be
completed from Ft. Pierre to Philip by the Pierre, Rapid City and North
Western Railway (PRC&NW), with 44 additional miles were completed by
the same company between Rapid City and Wasta that year. In 1907, the
bridge across the Missouri River at Pierre and 3 miles of track would be
completed by the Pierre & Ft. Pierre Bridge Railway, and the
remaining 44 miles would be completed from Philip to Wasta by the
PRC&NW. The PRC&NW and Pierre & Ft. Pierre Bridge Railway
were both funded and controlled by the C&NW, and would later be
fully incorporated.
The C&NW operated the route between Winona and Rapid City as the
main line of the Dakota Division, eventually operating the passenger
train the "Dakota 400" over the route. As the line became less
profitable in the 1970s and 1980s, the C&NW was considering
abandoning the route. In 1986, the line between Winona and Rapid City
would be sold to the Dakota, Minnesota & Eastern Railroad. The
DM&E would be purchased by Canadian Pacific Railway (CP) in 2008.
In 2014, the DM&E entered into an agreement with the Genesee &
Wyoming owned Rapid City, Pierre and Eastern Railroad (RCP&E) to
sell 670 miles of track. Today, RCP&E operates the segment between
Pierre and Rapid City, South Dakota as the PRC Subdivision.
Located in rural Stanley County near the ghost town of Wendte, this through plate girder crosses Plum Creek along Bad River Road. Built in 1931 to replace a timber pile trestle, the bridge consists of a single 70-foot through plate girder span, approached by timber pile trestle spans, and set onto timber pile piers. The girder follows a standard design for the C&NW, including tapered ends. This design of bridge was commonly used by railroads throughout the United States, as it was durable and easy to construct. Significant bridge improvements were made to this line between 1925 and 1935, including replacing numerous bridges with steel spans. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being locally significant, due to the common design.
Citations
Builder and build date | Clinton Bridge Works plaque |
Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |