Hurley Railroad Crossing


Click the photo to view the full-size version

1/21
Date Taken:
Author:
Caption:

Name Hurley Railroad Crossing
Built By Wisconsin Central Railway
Currently Owned By Iron County
Superstructure Contractor Wisconsin Bridge & Iron Company of North Milwaukee, Wisconsin
Substructure Contractor Unknown
Length 125 Feet Total
Width 1 Track
Height Above Ground 20 Feet (Estimated)
Superstructure Design Baltimore Through Truss
Substructure Design Concrete
Date Built 1899
Traffic Count 0 Trains/Day (Bridge is Abandoned)
Current Status Abandoned
Significance Regional Significance
Documentation Date 12/22/2016

In 1887, the Penokee Railroad (PR) constructed a 26 mile railroad from Mellen, Wisconsin to the Wisconsin-Michigan State Line at Hurley, Wisconsin.  At the same time, the Gogebic and Montreal River Railroad (G&MR) constructed 7 additional miles from the State Line to Bessemer, Michigan.  Immediately, the PR leased the G&MR.  In 1888, the Penokee Railroad was sold to the Wisconsin Central Railroad (WC), which was reorganized as the Wisconsin Central Railway (WC) in 1899.  This line provided the WC with a branch line, which served iron ore mines in the Bessemer area.  Iron from these mines was shipped to Ashland, Wisconsin via the WC mainline at Mellen.  In 1909, the WC would be leased by the Minneapolis, St. Paul & Sault Ste. Marie Railway (Soo Line), which itself was controlled by the Canadian Pacific Railway (CP).

The Soo Line had constructed a large network of railroads, connecting the Upper Midwest with Canadian Railroads.  Throughout the early 20th Century, this line remained a branch line for the Soo Line.  In 1961, the WC would be merged with other CP subsidiaries Duluth, South Shore & Atlantic Railroad and the Soo Line to form Soo Line Railroad, a company controlled by CP.  In 1984, the Soo Line would be reorganized as the Soo Line Corporation in advance of a pending purchase of the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road).  In 1987, this line would be sold to Wisconsin Central, Ltd. (WC).  Known as the "new" Wisconsin Central, the railroad acquired several excess rail lines from the Soo Line, Milwaukee Road and Chicago & North Western Railway. The line was abandoned in 1997, and acquired for trail use.  Today, the Hurley to Bessemer segment is used by the Iron Belle Trail, while the remaining line is used for ATV trails or is abandoned.


Located west of Hurley, this unique through truss bridge carries the former Soo Line Bessemer Branch over the former Chicago & North Western Railway (C&NW). The first bridge at this location likely consisted of a timber bridge, constructed when the line was first built. During the 1890s, the Wisconsin Central Railway invested significant capital into this line, replacing aging wooden bridges with stronger steel structures. The present bridge at this location was constructed during the winter of 1898-1899. Currently, the bridge consists of a 150-foot, 4-panel, riveted Baltimore through truss span, set onto concrete abutments. Despite the two railroads crossing at an acute angle, the bridge is not skewed. A similar truss span allows for the crossing of the same two railroad lines west of Bessemer, Michigan. It is believed that Wisconsin Bridge & Iron Works fabricated the superstructure, as this company constructed all other steel bridges along this line. It is unknown if the substructures were constructed by an unknown contractor or by railroad company forces. The abutments use a variation of a standard design, with a long stepped wing wall placed parallel to the former C&NW.

Throughout the late 19th Century, most truss spans consisted of pin-connected Pratt spans. In the 1890s, railroads and fabricators began innovating different truss designs, seeking to maximize strength and economy. Riveted truss spans had existed since at least the 1870s, but had not been widely popular, due to the difficult nature of constructing them. By the mid 1890s, various riveted truss spans began to appear on several railroads throughout the United States. Baltimore truss spans were also developed in the 1890s as a stronger alternative to Pratt spans. The span at this location uses a short version of the Baltimore design, which combines design features of a Warren truss. With this design, the additional diagonals connect the mid-panel point with the bottom chord to provide greater compressive strength. The truss is heavily constructed, with built-up members and a standard floor. The endposts, bottom chord and top chord all use built-up beams, consisting of channels connected by V-lacing. Vertical members and diagonal members are also comprised of built-up beams, both using heavy V-lacing. The portal bracing and sway bracing use a typical lattice design, often used on Wisconsin Central bridges. The top and bottom lateral bracing both use plates, which are riveted the top and bottom chords. The floor uses a typical design, with plate girder floorbeams and two stringers comprised of plate girders. Since the initial construction, the bridge has seen few alterations. Currently, the bridge is abandoned, but occasionally used by ATVs and snowmobiles. The former C&NW underneath is now part of Trail 2, an ATV/UTV/snowmobile corridor. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being regionally significant, due to the unusual design and age.


Citations

Build date Iron County Republican; December 17, 1898
Builder Presumed based on builders of other nearby bridges
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele

Loading...