| Name | Iowa Falls Railroad Crossing (South) Chicago, Rock Island & Pacific Railroad Bridge #1468 |
| Built By | Chicago, Rock Island & Pacific Railway |
| Currently Owned By | Union Pacific Railroad |
| Superstructure Contractor | Unknown (Main Span) American Bridge Company of New York (Approach Spans) |
| Substructure Contractor | Unknown (Piers) Unknown (Abutments) |
| Length | 159 Feet Total, 75 Foot Main Span |
| Width | 1 Track |
| Height Above Ground | 25 Feet (Estimated) |
| Superstructure Design | Through Plate Girder and Steel Stringer |
| Substructure Design | Concrete |
| Date Built | c. 1910, Approaches Added 1941 |
| Date Replaced | 2018 |
| Traffic Count | 0 Trains/Day (Bridge has been Replaced) |
| Current Status | Replaced by a new bridge |
| Chicago, Rock Island & Pacific Railroad Bridge Number | 1468 |
| Union Pacific Railroad Bridge Number | 146.80 |
| Significance | Local Significance |
| Documentation Date | 11/4/2016; 5/26/2018 |
In 1901, the Des Moines, Iowa Falls & Northern Railway (DMIF&N) constructed a 74-mile railroad line, extending from the existing Chicago, Rock Island & Pacific Railway (Rock Island) mainline at Des Moines, Iowa to Iowa Falls, Iowa. In 1908, the DMIF&N was purchased by the St. Paul & Des Moines Railroad (StP&DM). Between 1908 and 1909, the StP&DM constructed an additional 44 miles of new railroad, extending to Mason City, Iowa. The StP&DM was acquired by the St. Paul & Kansas City Short Line Railroad (StP&KCSL) in 1911, which was a subsidiary of the Rock Island. The purpose of the StP&KCSL was to construct a direct route between St. Paul, Minnesota and Kansas City, Missouri. The Rock Island already owned a line across Missouri, as well as a line between Albert Lea, Minnesota and St. Paul, Minnesota. The StP&KCSL completed the connection between the two lines in 1913. To reach the existing line at Albert Lea, the Rock Island obtained trackage rights over the Chicago Great Western Railway (CGW) between Mason City and Manly, Iowa; and over the Minneapolis & St. Louis Railway (M&StL) between Manly and Albert Lea. The Rock Island was a large railroad, having constructed and acquired a significant railroad network in the central United States. This line provided a critical north-south connection between the northern and southern halves of the system. The line became known as the "Spine Line".
The Rock Island struggled financially throughout much of its history, experiencing repeated bankruptcies and chronic instability. In the early 1930s, the Rock Island constructed a new cutoff into Kansas City, further improving the route. After World War II, the Rock Island struggled to survive, proposing mergers and deferring maintenance on their routes. The railroad reorganized as the Chicago, Rock Island & Pacific Railroad in 1948, and the StP&KCSL was merged into the Rock Island at this time. Throughout the 20th Century, this line remained a critical mainline for the Rock Island. By the mid-1970s, the railroad was in serious decline. The railroad secured loans to eliminate slow orders, acquired new equipment, and attempted to restore profitability. Several sections of this line had fallen into serious disrepair, hampering the Rock Islands ability to maintain efficient operations. In 1978, the railroad came close to profit, but creditors were lobbying for a complete shutdown of the Rock Island. During the fall of 1979, a strike crippled the railroad. Many of the lines and equipment were scrapped. Profitable sections of railroad were prepared for sale. After the fall of the Rock Island, a bidding war ensued between the Chicago & North Western Railway (C&NW) and the Soo Line for the Spine Line. Ultimately, the C&NW was awarded the rights to purchase the line in 1981. Work on rehabilitating the line began soon after, and by 1983, the entire line had been extensively rebuilt. In 1995, the C&NW was purchased by Union Pacific Railroad (UP). Today, UP operates the Des Moines to Mason City segment of the Spine Line as the Mason City Subdivision.
Located on the south side of Iowa Falls, this through plate girder bridge carried a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over a Union Pacific Railroad (former Chicago & North Western Railway) branch line. At this location, both the Illinois Central Railroad and the Rock Island crossed the C&NW on grade separated crossings. It is unclear if the first bridge at this location included the through girder span, or if that was added shortly after the line was first built. It is believed between the 1910s and the early 1940s, the bridge consisted of a 75-foot through plate girder span, set onto concrete piers and approached by timber pile trestle spans on either end. By using timber spans at the end, the approach embankments were allowed to settle without damaging any permanent bridging. In 1941, the bridge was altered by replacing the approach spans with new steel stringer spans, set onto new concrete abutments. The bridge consisted of a 75-foot through plate girder span, approached by a 42-foot steel stringer span on either end. The entire bridge was set onto concrete substructures. The main span followed a standard Rock Island design, with two heavy plate girders, rounded and tapered girder ends and a ballast deck floor system. This floor system consisted of several parallel stringers, set above shallow transverse and lateral bracing. The approach spans also followed a standard design, with six shallow beams covered by a concrete ballast deck. Both piers used a standard rectangular design, while the abutments used a standard 1940s-era design with short sloped wing walls. An unknown contractor fabricated the main span, while American Bridge Company fabricated the approach spans. It is possible that the main span was fabricated by the Des Moines Bridge & Iron Works, which fabricated the nearby bridge over the Iowa River in 1908. The piers and abutments were built by two different unknown contractors. Through plate girder spans and steel stringer spans were popular for railroad use, as they were durable and easy to construct. Since the 1941 alterations, the bridge had seen no significant alterations. The bridge was replaced by a nearly identical modern structure on all new substructures in 2018. It is unclear why the bridge was replaced, but slope stability and clearance could be possible reasons. Overall, the bridge appeared to be in fair condition at the time of replacement, with some cracking noted throughout the substructures. The author has ranked this bridge as being locally significant, due to the common design and unclear history.
Citations
| Build date and builder (approach spans superstructure) | American Bridge Company plaque |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |