| Name | CPKC Iowa River Bridge (Columbus Junction) Chicago, Rock Island & Pacific Railroad Bridge #2300 |
| Built By | Chicago, Rock Island & Pacific Railway |
| Currently Owned By | Canadian Pacific Kansas City Limited |
| Superstructure Contractors | McClintic-Marshall Construction Company of Pittsburgh, Pennsylvania (Spans #2, #5-#6, #8-#10 and #12) American Bridge Company of New York (Span #1) Vierling Steel Works of Chicago, Illinois (Spans #3-#4, #7, #11, #14 and #18) Unknown (Spans #13, #15-#17 and #19-#21) |
| Superstructure Contractors | Thomas Phee & Company of Chicago, Illinois (Piers #3, #5, #7 and #10) Bates & Rogers Construction Company of Chicago, Illinois (Piers #1, #2, #4, #6, #8, #9, #11 and #12) Unknown (Abutments and Remaining Piers) |
| Length | 1551 Feet Total, 103 Foot Largest Spans |
| Width | 1 Track |
| Height Above Ground | 15 Feet (Estimated) |
| Superstructure Design | Deck Plate Girder |
| Substructure Design | Stone Masonry and Concrete |
| Date Built | 1904 (Spans #15, #20 and #21) 1910 (Spans #2, #5-#6, #8-#10 and #12) 1912 (Span #1) c. 1920 (Spans #16 and #17) 1945 (Span #3, #4, #7, #11, #14 and #18) c. 1995 (Spans #13 and #19) |
| Traffic Count | 10 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago, Rock Island & Pacific Railroad Bridge Number | 2300 |
| Significance | Moderate Significance |
| Documentation Date | 10/22/2016 |
In 1856, the Mississippi and Missouri Rail Road Company (M&M) constructed a 12-mile railroad line, extending from Wilton, Iowa to Muscatine, Iowa. In 1859, the line was extended an additional 35 miles to Washington, Iowa. In 1866, the M&M and the Chicago and Rock Island Rail Road Company (C&RI) merged to form the Chicago, Rock Island & Pacific Railroad (Rock Island). Between 1869 and 1870, the Chicago & South Western Railway (C&SW) constructed an additional 268 miles of railroad, extending from Washington, Iowa to Stillings Junction, Missouri (opposite of Leavenworth, Kansas). The C&SW became part of the Iowa Southern & Missouri Northern Railroad (IS&MN) in 1876, and the IS&MN and Rock Island were consolidated to form the Chicago, Rock Island & Pacific Railway (Rock Island) in 1880. In 1881, the Rock Island completed an additional 26 miles of railroad, extending from Davenport, Iowa to Muscatine. The Rock Island had constructed and acquired a large railroad network in the central United States during the late 19th Century. This line formed one of the principal mainlines, connecting the eastern and western portions of the system. In 1931, a new cutoff was constructed between Trenton, Missouri and Kansas City, reducing the importance of the western section of this line. The segment between Wilton and Muscatine was abandoned in 1934 in favor of the Davenport-Muscatine line. Between 1944 and 1948, almost the entire line between Washington and Centerville, Iowa was rebuilt on a new alignment. The new line instead turned southwest at Ainsworth, roughly paralleling the old route on a straighter and flatter alignment. With the exception of the line between Ainsworth and Washington and a short spur into Centerville, the entirety of the old line was abandoned.
The Rock Island struggled financially throughout much of its history, experiencing repeated bankruptcies and chronic instability. After World War II, the Rock Island struggled to survive, proposing mergers and deferring maintenance on their routes. The railroad reorganized as the Chicago, Rock Island & Pacific Railroad in 1948. Further improvements were made in 1950, when portions between Centerville and Allerton, Iowa were realigned. The segment from Trenton to Stillings Junction was abandoned in approximately 1973. By the mid-1970s, the railroad was in serious decline. The railroad secured loans to eliminate slow orders, acquired new equipment, and attempted to restore profitability. Several sections of this line had fallen into serious disrepair, hampering the Rock Islands ability to maintain efficient operations. In 1978, the railroad came close to profit, but creditors were lobbying for a complete shutdown of the Rock Island. During the fall of 1979, a strike crippled the railroad, and by January of 1980, the entire system was ordered to be shut down and liquidated. Many of the lines and equipment were scrapped. Profitable sections of railroad were prepared for sale.
The segment between Davenport and Washington was sold to the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) in 1981 to replace their line between Muscatine and Washington. The segment between Allerton and Trenton was sold to the Chicago & North Western Railway (C&NW) in 1981 as part of a sale for the St. Paul-Kansas City "Spine Line". A short segment southeast of Centerville was sold to the Appanoose County Community Railroad (APNC) in 1984. The remainder of the line between Ainsworth and Allerton was abandoned. In the early 1980s, both the Milwaukee Road and C&NW made improvements to deteriorated Rock Island track on their purchased segments. By 1985, a suitor for the struggling Milwaukee Road was being sought, and the Soo Line Railroad, controlled by Canadian Pacific Railway (CP) purchased the Milwaukee Road in 1986. In 1995, Union Pacific Railroad (UP) purchased the C&NW. In 2016, the APNC was purchased by the Iowa Southern Railway (ISRY), which is operated by Progressive Rail. CP merged with Kansas City Southern Railway in 2023 to form CPKC. Today, CPKC operates the Davenport to Washington segment of this line as part of the Ottumwa Subdivision; UP operates the Allerton to Trenton portion of this line as part of the Trenton Subdivision and ISRY continues to operate a short segment of track near Centerville. The remainder of the line has been reverted to adjacent landowners.
View an article discussing the 1910 reconstruction of this bridge (digitized by Google)
Located on the east side of Columbus Junction, this lengthy deck plate girder bridge carries a former Chicago, Rock Island & Pacific Railroad (Rock Island) mainline over the Iowa River at it's confluence with the Cedar River. Similar to many large bridges constructed by the Rock Island, this bridge has a lengthy history of partial replacements and modifications. The first bridge at this location was likely a wooden Howe through truss bridge, consisting of six 150-foot spans set onto stone piers and approached by lengthy timber pile trestle approaches on either end. In 1869, the bridge was rebuilt with six new combination Thatcher through truss spans, reusing the same piers. Combination truss spans consisted of both wood and iron members, with the placement of each intended to maximize strength. In 1891, the main spans were replaced by six 150-foot, riveted quadrangular lattice through truss spans, set onto the same stone piers. It is believed these spans were fabricated by Lassig Bridge & Iron Works, which did significant work for the Rock Island during this era. Between 1902 and 1904, several new stone piers were constructed at the west end of the bridge, and nine new deck plate girder spans were installed. Further alterations were made to the bridge in 1905, when several of the original stone piers were replaced with concrete.
In 1910, the Rock Island undertook a major project to replace the truss spans with eleven new deck plate girder spans (spans #2 through #12), and several new concrete piers were installed. In addition, it is believed the stone piers of the west approach were altered at this time to raise the grade of the bridge. Due to the cost of falsework, it was decided to instead to install the new girders using an innovative method where a temporary hoist was installed on the trusses and the spans lowered into place. It is unclear if the truss spans were reused at other locations. In 1912, the east approach was filled and a single deck plate girder span (span #1) was installed. In approximately 1920, spans #16 and #17 were reconstructed with heavier plate girders. Further alterations were made to the bridge in 1945-46, when spans #3, #4, #7, #11 and #14 were replaced with newer spans of a similar design. The most recent alteration to the bridge came in approximately 1995, when spans #13 and #19 were replaced with modern deck plate girder spans. From east to west, the bridge consists of twenty one deck plate girder spans, including one 60-foot span (span #1), one 75-foot span (span #2), five 78-foot spans (spans #3 through #7), three 103-foot spans (spans #8 through #10), one 78-foot span and one 75-foot span (spans #11 and #12), seven 68-foot spans (spans #13 through #19), one 50-foot span (span #20) and one 45-foot span (span #21). The bridge is set onto a combination of concrete and stone substructures, which were constructed and altered at various times
Due to the variety of build dates, the superstructure uses a number of different designs. Spans #1, #2, #5, #6, #12, #15, #20 and #21 all use a standard design for the early 20th Century, with two heavy plate girders and an open deck. Spans #8, #9 and #10 are similarly constructed, but consist of significantly heavier plate girders. These spans were unusually large for the era, and it was decided to use larger spans instead of adding an additional pier due to the slight cost differences. Spans #16 and #17 appear to also use heavy plate girders, which may have been modified. A distant view shows that the corners of the girders were cut away to prevent alterations to the piers. It is unclear if these spans were constructed from secondhand material, and little is known about the history of the spans. Spans #3, #4, #7, #11, #14 and #18 all use a typical mid-20th Century design, with welded plate girders and an open deck. Spans #13 and #19 both consist of a modern steel design, with heavy bolted connections. The substructures follow a handful of different designs, with the 1905-era piers using large rectangular structures and the 1910-era piers using smaller rectangular structures. The west approach piers are rectangular in shape, and are mainly composed of stone with a concrete cap. The east abutment follows a standard Rock Island design, with sloped wing walls, while the west abutment consists of stone capped with concrete and uses stepped wing walls. Stone for the substructures consists of a brown limestone, quarried at an unknown location.
A number of different contractors were involved with constructing the bridge. It is believed that McClintic-Marshall Construction Company fabricated spans #2, #5, #6, #8, #9, #10 and #12; while American Bridge Company fabricated span #1. Spans #3, #4, #7, #11, #14 and #18 were all fabricated by the Vierling Steel Works, while spans #13, #15, #16, #17, #19, #20 and #21 were fabricated by multiple unknown contractors. Piers #3, #5, #7 and #10 were constructed by Thomas Phee & Company in 1905. Piers #1, #2, #4, #6, #8, #9, #11 and #12 were all constructed by the Bates & Rogers Construction Company in 1910. It is believed this same firm altered the piers of the west approach as well. Multiple unknown contractors constructed both abutments and piers #13 through #20. Deck plate girder spans were popular for railroad use, as they were durable and easy to construct. Since the Rock Island was often in poor financial condition, the railroad rarely replaced entire major bridges. Instead, the company saved costs by constructing and altering large bridges in a piecemeal fashion. Overall, the bridge appears to be in fair to good condition, and remains regularly used. The author has ranked this bridge as being moderately significant, due to the unusual number of different spans and contractors.
Citations
| Build date and builder (span #1) | American Bridge Company plaque |
| Build date and builder (spans #2, #5-#6, #8-#10 and #12) | Railway Age Gazette; Volume 52, Issue 3 Iron Trade Review; Volume 44, Issue 20 |
| Build date and builder (spans #3-#4, #7, #11, #14 and #18) | The Muscatine Journal; June 14, 1945 Vierling Steel Works plaque |
| Build date (spans #15, #20 and #21) | Columbus Gazette; December 21, 1904 |
| Builder (piers #3, #5, #7 and #10) Builder (piers #1, #2, #4, #6, #8, #9, #11 and #12) |
Columbus Gazette; November 2, 1911 Columbus Gazette; January 20, 1910 |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |