UP Lakeview Drive Bridge


Click the photo to view the full-size version

1/5
Date Taken:
Author:
Caption:

Name UP Lakeview Drive Bridge
Chicago & North Western Railway Bridge #2654
Built By Milwaukee, Sparta & North Western Railway
Currently Owned By Union Pacific Railroad
Superstructure Contractor American Bridge Company of New York
Substructure Contractor Bates & Rogers Construction Company of Chicago, Illinois
Length 31 Feet Total
Width 1 Track
Height Above Ground 12 Feet (Estimated)
Superstructure Design Steel Stringer
Substructure Design Concrete
Date Built 1911
Traffic Count 5 Trains/Day (Estimated)
Current Status In Use
Chicago & North Western Railway Bridge Number 2654
Union Pacific Railroad Bridge Number 225.67
Significance Local Significance
Documentation Date 3/25/2016

In 1884, the Princeton & Western Railway (P&W) constructed a 13 mile branch from the existing Chicago, St. Paul, Minneapolis & Omaha Railway (Omaha Road) at Wyeville, Wisconsin to Necedah, Wisconsin.  The railroad soon came under lease of the Chicago & North Western Railway (C&NW).  During the early 20th Century, the C&NW began a program of improvements, constructing new cutoffs and significantly increasingly efficiency over the system, particularly in Wisconsin and northern Illinois.  In 1910, the Milwaukee, Sparta & North Western Railway (MS&NW), a subsidiary of the C&NW, began construction a new cutoff across central Wisconsin.  In 1912, the MS&NW completed 23 miles between Sparta, Wisconsin and Wyeville, Wisconsin; as well as 133 miles between Necedah and Wiscona, a railroad junction on the north side of Milwaukee.  The P&W was sold to the MS&NW in 1912, which was promptly consolidated into the C&NW.  This line provided a better connection for the C&NW through Wisconsin, and avoided the steep grades of the previous mainline from Sparta to Madison.  The line also improved the C&NW connection to the Twin Cities of Minneapolis and St. Paul by way of the C&NW controlled Omaha Road.  The line between Butler, Wisconsin and Clyman Junction, Wisconsin would be double tracked; while the remainder between Clyman Junction and Wyeville was built wide enough for a second track, but no second track was installed.

By the 1920s, the C&NW was operating an expansive railroad network throughout the Midwest, radiating north and west from Chicago.  This line served as one of the principal mainlines of the railroad, connecting Milwaukee to the Twin Cities.  In 1959, much of the second track between Butler and Clyman Junction was removed as operations over the line no longer warranted a second track.  The line remained largely unchanged until March 1973, when a tunnel collapsed at Tunnel City, Wisconsin.  This led to the line being abandoned west of Tunnel City, and a new connection track being constructed to the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) mainline, which the C&NW would use to reach Winona, Minnesota.  In 1995, the C&NW was purchased by the Union Pacific Railroad, the current owner of this line.  Today, UP operates the Wyeville Subdivision between Wyeville and Adams, Wisconsin; the Adams Subdivision between Adams and Wiscona; and the Winona Subdivision between Wyeville and Tunnel City.  The segment between Tunnel City and Sparta remains abandoned, although much of the infrastructure remains intact.


View an article discussing construction of the Milwaukee, Sparta & North Western Railway (digitalized by Google)

Located south of Packwaukee, this steel stringer bridge carries the former Chicago & North Western Railway mainline over Lakeview Drive. Built in 1911 as subsidiary Milwaukee, Sparta & North Western Railway constructed a new line through the area, the bridge consists of a single 31-foot steel stringer span, set onto concrete abutments. The superstructure uses a design which became popular with the C&NW during the early 1910s, which is considered a "trough floor girder". This type of bridge is formed by placing a ballast channel over hollow girders, which are typically filled with concrete. This type of span became popular during track elevation projects in Chicago, and its use was expanded throughout the system. The substructures use a typical design, with wing walls extending perpendicular to the track. Unlike many bridges along this line, there is no evidence that the abutments were constructed wide enough for a future second track. American Bridge Company fabricated the superstructure, while the Bates & Rogers Construction Company constructed the substructure. Steel stringer bridges were commonly used by railroads, as they were durable and easy to construct. This bridge uses an unusual design, which was replicated at several points along the MS&NW mainline. Currently, the bridge remains in use, and has seen few alterations since its original construction. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked this bridge as being locally significant, due to the common design.


Citations

Builders and build date Chicago & North Western Valuation Notes at the Chicago & North Western Historical Society Archives
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele