CPKC S. Fork Whitewater River Bridge #2
×
Name |
CPKC S. Fork Whitewater River Bridge #2 Chicago & North Western Railway Bridge #M-94 |
Built By |
Chicago & North Western Railway |
Currently Owned By |
Canadian Pacific Kansas City Limited |
Superstructure Contractor |
American Bridge Company of New York
|
Substructure Contractor |
Unknown
|
Length |
45 Feet Total |
Width |
1 Track |
Height Above Ground |
5 Feet (Estimated) |
Superstructure Design |
Through Plate Girder
|
Substructure Design |
Stone Masonry and Concrete
|
Date Built |
1903
|
Traffic Count |
5 Trains/Day (Estimated) |
Current Status |
In Use |
Chicago & North Western Railway Bridge Number |
M-94 |
Significance |
Local Significance |
Documentation Date |
8/12/2015 |
In 1864, 50 miles of new railroad was completed from Winona to Rochester, Minnesota by the Winona and Saint Peter Railway (W&StP). The following year, an additional 55 miles was completed to Waseca. The Chicago & North Western Railway (C&NW) would purchase a controlling stake in the W&StP in 1867. Construction would continue in 1870, with an additional 11 miles completed between Waseca and Janesville. The following year, 23 additional miles were opened to Mankato, followed by 30 additional miles completed to New Ulm in 1872. 62 more miles were completed to Tracy, Minnesota in 1879.
From Tracy, the route would be continued westwards in 1879, with numerous branch lines built off the main line. In 1900, the Mankato & New Ulm Railway (M&NU) would complete a new route, 26 miles in length between Mankato and New Ulm. This new line bypassed the old line, which used two large iron bridges to cross the Minnesota River. The W&StP and M&NU would be consolidated into the C&NW in June 1900. The C&NW operated this route as the main line of the Dakota Division, eventually operating the passenger train the "Dakota 400" over the route. Because the original line between Mankato and New Ulm was not considered necessary, the line was abandoned in stages. The first segment abandoned was between Burdette (Mankato) and Kasota, followed by the Kasota to St. Peter segment in 1957. The line was further abandoned between St. Peter and Traverse in 1963, and between Traverse and the New Ulm Quarry in 1970.
As the line became less profitable in the 1970s and 1980s, the C&NW was considering abandoning the route. In 1986, the line between Winona and Rapid City, South Dakota would be sold to the Dakota, Minnesota & Eastern Railroad. The DM&E would be purchased by Canadian Pacific Railway (CP) in 2008. In 2023, CP merged with Kansas City Southern to form Canadian Pacific Kansas City Limited, commonly known as CPKC. CPKC continues to operate the Winona to Waseca segment as the Waseca Subdivision.
Located along in Eyota, this through plate girder bridge is the second crossing carrying the former Chicago & North Western Railway over the South Fork Whitewater River. The first bridge at this location was likely a timber pile trestle, constructed when the line was constructed. In 1903, the bridge wouls be replaced by the current structure. The bridge consists of a 45-foot through plate girder span, set onto stone abutments. The girder uses a standard C&NW design, with a traditionally composed floor, large girders and squared ends. American Bridge Company fabricated the bridge, and an unknown contractor constructed the abutments. The stone abutments were encased with concrete in the early 2000s. Through girder spans were popular with railroads, as they were durable and easy to construct. Overall, the bridge appears to be in fair to good condition, with no significant deterioration noted. The author has ranked the bridge as being locally significant, due to the common design.
Citations
Build date |
Chicago & North Western Valuation Notes at the Chicago & North Western Historical Society Archives |
Superstructure builder |
Missing American Bridge Company plaque |
Railroad History Citation |
ICC Valuation Information, Compiled by Richard S. Steele |