| Name | UP Oconomowoc River Bridge Chicago & North Western Railway Bridge #2442 |
| Built By | Milwaukee, Sparta & North Western Railway |
| Currently Owned By | Union Pacific Railroad |
| Superstructure Contractor | Cleary-White Construction Company of Chicago, Illinois |
| Length | 111 Feet Total, 30 Foot Spans |
| Width | 2 Tracks, 1 In Use (39 Feet) |
| Height Above Ground | 20 Feet (Estimated) |
| Superstructure Design | Concrete Arch |
| Substructure Design | Concrete |
| Date Built | 1910 |
| Traffic Count | 5 Trains/Day (Estimated) |
| Current Status | In Use |
| Chicago & North Western Railway Bridge Number | 2442 |
| Union Pacific Railroad Bridge Number | 298.31 |
| Significance | Moderate Significance |
| Documentation Date | 8/6/2016; 2/11/2023 |
In 1884, the Princeton & Western Railway (P&W) constructed a 13 mile branch from the existing Chicago, St. Paul, Minneapolis & Omaha Railway (Omaha Road) at Wyeville, Wisconsin to Necedah, Wisconsin. The railroad soon came under lease of the Chicago & North Western Railway (C&NW). During the early 20th Century, the C&NW began a program of improvements, constructing new cutoffs and significantly increasingly efficiency over the system, particularly in Wisconsin and northern Illinois. In 1910, the Milwaukee, Sparta & North Western Railway (MS&NW), a subsidiary of the C&NW, began construction a new cutoff across central Wisconsin. In 1912, the MS&NW completed 23 miles between Sparta, Wisconsin and Wyeville, Wisconsin; as well as 133 miles between Necedah and Wiscona, a railroad junction on the north side of Milwaukee. The P&W was sold to the MS&NW in 1912, which was promptly consolidated into the C&NW. This line provided a better connection for the C&NW through Wisconsin, and avoided the steep grades of the previous mainline from Sparta to Madison. The line also improved the C&NW connection to the Twin Cities of Minneapolis and St. Paul by way of the C&NW controlled Omaha Road. The line between Butler, Wisconsin and Clyman Junction, Wisconsin would be double tracked; while the remainder between Clyman Junction and Wyeville was built wide enough for a second track, but no second track was installed.
By the 1920s, the C&NW was operating an expansive railroad network throughout the Midwest, radiating north and west from Chicago. This line served as one of the principal mainlines of the railroad, connecting Milwaukee to the Twin Cities. In 1959, much of the second track between Butler and Clyman Junction was removed as operations over the line no longer warranted a second track. The line remained largely unchanged until March 1973, when a tunnel collapsed at Tunnel City, Wisconsin. This led to the line being abandoned west of Tunnel City, and a new connection track being constructed to the Chicago, Milwaukee, St. Paul & Pacific Railroad (Milwaukee Road) mainline, which the C&NW would use to reach Winona, Minnesota. In 1995, the C&NW was purchased by the Union Pacific Railroad, the current owner of this line. Today, UP operates the Wyeville Subdivision between Wyeville and Adams, Wisconsin; the Adams Subdivision between Adams and Wiscona; and the Winona Subdivision between Wyeville and Tunnel City. The segment between Tunnel City and Sparta remains abandoned, although much of the infrastructure remains intact.
Located east of North Lake, this large concrete arch bridge carries the former Chicago & North Western Railway mainline over the Oconomowoc River and Kilbourne Road. Built in 1910 as subsidiary Milwaukee, Sparta & North Western Railway constructed a new line through the area, the bridge consists of three 30-foot concrete arch spans, set onto concrete substructures and constructed at a width of 39 feet. Among the largest concrete arch bridges constructed for the MS&NW, the bridge is heavily reinforced and was constructed for two tracks. The structure uses a typical design, with large semicircular arches and sloped wing walls extending diagonally from the bridge. Unique to this bridge, large concrete buttresses support the spandrel walls at the piers. Typical of concrete bridges along this section of line, the Cleary-White Construction Company constructed the bridge. This company completed several concrete bridges for the C&NW. Concrete arch bridges were commonly used by railroads, as they were durable and easy to construct. Bridgehunter.com indicates that pipe railings were added to the bridge in 1928, and the structure was extensively rehabilitated in 1945. The north track was removed from the bridge in 1959, and today the south track remains in use. Overall, the bridge appears to be in fair condition, with no significant deterioration noted. Various concrete repairs have been made to the structure since it was first constructed. The author has ranked this bridge as being moderately significant, due to the large scale implementation of a common design.
Citations
| Builder and build date | Chicago & North Western Railway Valuation Notes at the Chicago & North Western Historical Society Archives |
| Railroad History Citation | ICC Valuation Information, Compiled by Richard S. Steele |