Abandoned Elston Avenue Bridge


Click the photo to view the full-size version

1/13
Date Taken:
Author:
Caption:

Name Abandoned Elston Avenue Bridge
Chicago, Milwaukee & St. Paul Railway Bridge #Z-6E
Built By Chicago, Milwaukee & St. Paul Railway
Currently Owned By City of Chicago
Superstructure Contractor Lassig Bridge & Iron Works of Chicago
Length 75 Feet Total
Width 2 Tracks
Height Above Ground 13 Feet 8 Inches
Superstructure Design Through Plate Girder
Substructure Design Concrete
Date Built 1899
Traffic Count 0 Trains/Day (Bridge is Abandoned)
Current Status Abandoned
Chicago, Milwaukee & St. Paul Railway Bridge Number Z-6E
Significance Local Significance
Documentation Date 9/30/2023

In 1872, the Chicago and Pacific Railroad was charted to construct a new 88-mile railroad line extending from Chicago, Illinois to Byron, Illinois.  Construction began on the line in 1873, and the line was completed to Elgin in 1874, followed by to Byron in 1876.  In Chicago, the railroad crossed the Chicago River three times, crossed Goose Island and turned west along Bloomingdale Avenue.  In 1880, the railroad came under lease of the Chicago, Milwaukee & St. Paul Railway, commonly known as the Milwaukee Road.  The Milwaukee Road continued construction, reaching Kittredge, Illinois in 1882.  At Kittredge, this line connected to a line that had been completed to Savanna, Illinois by the Northern Illinois Railroad in 1862.  This line became a principal mainline for the Milwaukee Road, later extending across Iowa to reach Omaha.  Because of the importance of this line, the portion of the line west of Bloomingdale Avenue in Chicago to Bensenville was double tracked in 1885.  In 1892, construction on a second track began between Bensenville and Genoa, which would be completed in 1897.  By 1899, the line was double tracked to Savanna.  During the late 19th Century, the numerous grade crossings throughout Chicago became a hazard for the general public, and the City of Chicago investigated solutions.  The City issued ordinances to railroads to elevate their tracks.  This line was elevated between Elston Avenue and Ashland Avenue in 1899, followed by the section from Lawndale Avenue to Pulaski Road in 1900 and from Pulaski Road to Kostner Avenue by 1902.  The Bloomingdale Line from Ashland Avenue to Lawndale Avenue would be elevated between 1913 and 1915. 

By the 20th Century, the Milwaukee Road had become a prominent railroad in the United States, operating a network of railroad lines primarily in the Midwest.  The Milwaukee Road was often in financial trouble, especially after the costly Pacific Extension was completed in 1909. In 1925, the company declared bankruptcy, and reorganized as the Chicago, Milwaukee, St. Paul and Pacific Railroad in 1928.  This line continued to serve as a critical mainline for the railroad during the 20th Century, as it provided a connection between Chicago and the mainlines to Omaha and Kansas City.  Significant upgrades were made during the 1930s and 1940s, including replacing bridges and revising curves.  During the 1970s, conditions of the line gradually deteriorated, and much of the second track was removed in the late 1970s. 

Portions of the line in Chicago were removed in the late 1970s.  By 1985, a suitor for the Milwaukee Road was being sought, and the Soo Line Railroad, controlled by Canadian Pacific Railway (CP) purchased the Milwaukee Road in 1986.  In 1997, CP would sell the line segment to I&M Rail Link, which was purchased by the Dakota, Minnesota & Eastern Railroad (DM&E) subsidiary Iowa, Chicago & Eastern Railroad (IC&E).  Portions of the Bloomingdale Line between Pacific Junction and the Kennedy Expressway were abandoned in 2001.  Chicago Transfer Railway (CTR) began operations around Goose Island in 2007, using former Milwaukee Road trackage.  The DM&E/IC&E were purchased by Canadian Pacific in 2008.  The Bloomingdale/606 Trail was constructed on the right-of-way between Ashland Avenue and Lawndale Avenue in 2014.  The CTR trackage was abandoned in 2018.  CP merged with Kansas City Southern Railway in 2023 to form CPKC.  Today, CPKC operates the Elgin Subdivision between Pacific Junction and Randall Road in Elgin; and the Chicago Subdivision between Elgin and Savanna.  In addition, Metra operates commuter service as the Milwaukee West line over the Elgin Subdivision.


Located in the West Town neighborhood of Chicago, this through girder bridge carries the former Milwaukee Road Bloomingdale Line over Elston Avenue. In the late 1890s, the City of Chicago passed an ordinance requiring the elevation of the Wisconsin Division of the Chicago & North Western Railway (C&NW). To maintain a crossing with the C&NW at grade, the Milwaukee Road constructed underpasses at Elston Avenue and Ashland Avenue and elevated a short segment of tracks. This bridge consists of a 75-foot through plate girder span, set onto concrete abutments. The span was constructed for two tracks, and utilizes features typical of similar grade separation structures. The ends of the girders are rounded, and the floor is constructed of parallel floorbeams with a sheet metal deck. This type of structure was initially popular for grade separations in Chicago, but fell out of favor as trough floor spans and concrete spans became more economical. The metal floor of this design of bridge was susceptible to pooling water, which would cause corrosion to the steel. In addition, the through girder design limited horizontal clearances on the bridge. Overall, the bridge appears to be in fair condition, with no significant deterioration noted. The tracks were removed from the bridge in 2018, and the bridge was acquired by the City of Chicago. It is anticipated that the bridge will be reused as a part of the Bloomingdale Trail. The author has ranked the bridge as being locally significant, due to the common design.


Citations

Build date Elevation of adjacent C&NW tracks
Builder Missing Lassig Bridge & Iron Works plaque
Railroad History Citation ICC Valuation Information, Compiled by Richard S. Steele

Loading...