Home
Profile
Search For Bridge
Logout
Manage RR Stories
Update RR Story
Update Railroad Story
Story Name
Railroad
Current Railroad
Valuation Section(s)
Subdivision(s)
State
South/West Terminal
North/East Terminal
Description
Text
HTML5
<p>In 1873, the Chicago, Pekin & Southwestern Railway (CP&SW) began construction on 52 miles of new railroad, extending from Pekin to Pekin Junction, Illinois and from Eureka, Illinois to Ancona, Illinois. At the same time, the Chicago & Illinois River Railroad (C&IR) began construction on a 28 mile spur from Coal City, Illinois to Streator, Illinois, but work was soon ceased. The CP&SW purchased the incomplete line from Gorman to Streator, and connected it to Ancona. The CP&SW was purchased by the Chicago, St. Louis & Western Railroad in 1881, which constructed an additional 60 miles into Chicago, opening in 1884. The railroad was reorganized into the Chicago & St. Louis Railway (C&StL) in 1886. By the mid-1880s, the Atchison, Topeka & Santa Fe Railway (ATSF) was contemplating on extending their network from Kansas City, Missouri to Chicago, where the railroad could interchange with other large railroads. In 1887, the Chicago, California & Santa Fe Railway (CC&SF) began construction on 350 miles of new railroad, extending from Ancona to Sugar Creek Junction, near Kansas City. Work would be completed in 1888. The portion of the line from Ancona to Chicago would be reconstructed at this time to meet new standards. </p><p>The new line featured the most direct railroad route between the two cities, crossing the Mississippi River at Fort Madison, Iowa; and the Missouri River at Sibley, Iowa. The new line was leased to the ATSF in 1888, and fully absorbed into the ATSF in 1900. The line immediately became a core line for the ATSF, serving as part of the principal mainline (Chicago to Los Angeles) for the ATSF. During the first decade of the 20th Century, the Kansas City to Chicago line was extensively rebuilt for double track use. Due to dwindling traffic, the route from Ancona to Pekin was abandoned in 1983 and 1984. In 1996, the ATSF was merged into Burlington Northern Railroad to form BNSF Railway. Today, BNSF operates this line as the Chillicothe Subdivision and the Marceline Subdivision. The line continues to be one of the heaviest used railroad routes in the Midwest.<br></p>
Update Story